T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

US$900,000-3,000,000
Rated power: 66
Maximum heat load: 143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

US$90,000-360,000
Fresh steam consumption: 330
Fresh steam pressure: 12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

US$900,000-3,000,000
Maximum power: 220
Pressure: 12.8
UTZ OJSC 🇷🇺
Complete K-330-23.5-1R Steam Turbine for Power Unit 4

Complete K-330-23.5-1R Steam Turbine for Power Unit 4

US$300,000-1,800,000
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

US$42,000-150,000
Electric power: B1/B8 2100/900 MHz
Absolute vapor pressure: 3
PJSC KALUGA TURBINE PLANT 🇷🇺
K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

US$900,000-3,000,000
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Energy Steam Turbine for Electric Generators 1.4MW to 80MW

Energy Steam Turbine for Electric Generators 1.4MW to 80MW

US$180,000-1,800,000
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
PJSC KALUGA TURBINE PLANT 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

US$1,500,000-4,800,000
Rated power: 124.9
Nominal fresh steam flow rate: 524
UTZ OJSC 🇷🇺
Complete PT-60/70-130/7 Steam Turbine for Power Generation

Complete PT-60/70-130/7 Steam Turbine for Power Generation

US$900,000-3,600,000
Nominal fresh steam flow rate: 96.7
Absolute pressure of fresh steam upstream of the stop valves of CVD: 12.75
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

US$900,000-3,000,000
Nominal / maximum fresh steam flow rate: 275
Temperature of steam after superheating before stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

US$30,000-180,000
Rated power: 16
Assignment: Drive of electric alternator
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

US$1,500,000-4,800,000
Rated power: 150
Maximum condensing power: 160
UTZ OJSC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

Save Your Time
Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

US$1,500,000-4,800,000
Rated electrical power: 190
Acute vapor pressure: 12.8
SILOVYE MASHINY OJSC 🇷🇺
K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

US$900,000-3,600,000
Rated power of turbine: 850
Temperature of steam after superheating before DDC stop valves: 542
SILOVYE MASHINY OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

US$90,000-300,000
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation

Steam Turbine R-50-12.8/1.5 for Power Generation

US$90,000-300,000
Assignment: for electricity and steam generation
Assignment: for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

US$1,500,000-4,800,000
Rated power: 120
Steam consumption: 540
UTZ OJSC 🇷🇺

Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation

US$90,000-600,000
Power: 1340...34000
Absolute pressure of fresh steam: 1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺