T-60/66-10.2 Steam Turbine - Single-Cylinder Design
US$900,000-3,000,000
Rated power:
66
Maximum heat load:
143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8
US$90,000-360,000
Fresh steam consumption:
330
Fresh steam pressure:
12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model
US$900,000-3,000,000
Maximum power:
220
Pressure:
12.8
UTZ OJSC 🇷🇺
Complete K-330-23.5-1R Steam Turbine for Power Unit 4
US$300,000-1,800,000
Nominal / maximum fresh steam flow rate:
275
Temperature of fresh steam upstream of stop valves of CVD and CSD:
540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine T-12/16-3.9/0.2 for Industrial Applications
US$42,000-150,000
Electric power:
B1/B8 2100/900 MHz
Absolute vapor pressure:
3
PJSC KALUGA TURBINE PLANT 🇷🇺
K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2
US$900,000-3,000,000
Nominal / maximum fresh steam flow rate:
275
Temperature of fresh steam upstream of stop valves of CVD and CSD:
540
SILOVYE MASHINY OJSC 🇷🇺
Energy Steam Turbine for Electric Generators 1.4MW to 80MW
US$180,000-1,800,000
Assignment:
For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
Assignment:
For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
PJSC KALUGA TURBINE PLANT 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator
US$1,500,000-4,800,000
Rated power:
124.9
Nominal fresh steam flow rate:
524
UTZ OJSC 🇷🇺
Complete PT-60/70-130/7 Steam Turbine for Power Generation
US$900,000-3,600,000
Nominal fresh steam flow rate:
96.7
Absolute pressure of fresh steam upstream of the stop valves of CVD:
12.75
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model
US$900,000-3,000,000
Nominal / maximum fresh steam flow rate:
275
Temperature of steam after superheating before stop valves:
540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation
US$30,000-180,000
Rated power:
16
Assignment:
Drive of electric alternator
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model
US$1,500,000-4,800,000
Rated power:
150
Maximum condensing power:
160
UTZ OJSC 🇷🇺
Post your Buy Requirement
Get Quotes from Verified Suppliers
Save Your Time
Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1
US$1,500,000-4,800,000
Rated electrical power:
190
Acute vapor pressure:
12.8
SILOVYE MASHINY OJSC 🇷🇺
K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model
US$900,000-3,600,000
Rated power of turbine:
850
Temperature of steam after superheating before DDC stop valves:
542
SILOVYE MASHINY OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use
US$90,000-300,000
Rated/maximum power:
88.4
Fresh steam pressure:
7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation
US$90,000-300,000
Assignment:
for electricity and steam generation
Assignment:
for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications
US$1,500,000-4,800,000
Rated power:
120
Steam consumption:
540
UTZ OJSC 🇷🇺
Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation
US$90,000-600,000
Power:
1340...34000
Absolute pressure of fresh steam:
1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺