1
Request Details
2
Contact Info
What do you need?

Describe the product or service you are looking for

Your Contact Information

We will contact you as soon as possible

✓
Request Submitted!

Thank you! We will contact you soon with the best offers.

Laboratory Setup for Studying Refrigeration Machine Operation with Air Condenser (PAHP-XM-VC)

Laboratory Setup for Studying Refrigeration Machine Operation with Air Condenser (PAHP-XM-VC) — TRIMBIRT LLC

品牌: TRIMBIRT
¥10,800 - ¥34,560 CNY
MOQ: 2 pieces

主要特点

Overall dimensions WxHxH: 1020x600x750 mm
Power supply voltage: 220 V
Power supply frequency: SBVVBG
Power consumption: 3.5 kW

更多来自 TRIMBIRT

Laboratory Installation for Studying Fountain Oil Production (NH-FDN)

Laboratory Installation for Studying Fountain Oil Production (NH-FDN)

¥10,800-¥34,560
Educational Stand for Gas Processes and Gas Constant (Gas Process Study)

Educational Stand for Gas Processes and Gas Constant (Gas Process Study)

¥6,480-¥21,600
Planetary Gear Reducer Study Setup (MX-DMRP)

Planetary Gear Reducer Study Setup (MX-DMRP)

¥6,480-¥21,600
Universal Gas Constant Determination Laboratory Setup (MF-GP)

Universal Gas Constant Determination Laboratory Setup (MF-GP)

¥6,480-¥21,600
Industrial Refrigeration Fault Finding Training Stand VSK-PN

Industrial Refrigeration Fault Finding Training Stand VSK-PN

¥15,120-¥43,200
Multi-Purpose Technological Apparatus Laboratory Setup (PAHP-MTA)

Multi-Purpose Technological Apparatus Laboratory Setup (PAHP-MTA)

¥30,240-¥108,000
Intelligent Electric Energy Accounting System Study Setup (EN-ISUEE)

Intelligent Electric Energy Accounting System Study Setup (EN-ISUEE)

¥10,800-¥34,560
Technical Thermogasodynamics Laboratory Setup (TOT-TTGD)

Technical Thermogasodynamics Laboratory Setup (TOT-TTGD)

¥15,120-¥43,200
Laboratory Setup for Gas Process Study (TOT-GP)

Laboratory Setup for Gas Process Study (TOT-GP)

¥6,480-¥21,600
Laboratory Setup for Studying Radiative Heat Transfer (TOT-TI)

Laboratory Setup for Studying Radiative Heat Transfer (TOT-TI)

¥10,800-¥34,560
Vibration Study Laboratory Setup (MX-VB)

Vibration Study Laboratory Setup (MX-VB)

¥6,480-¥21,600
Hydro Energy Learning System (Turbine-Generator) EN-TG

Hydro Energy Learning System (Turbine-Generator) EN-TG

¥15,120-¥47,520
Laboratory Setup for Thermal Conductivity Testing of Insulating Materials (TOT-TM)

Laboratory Setup for Thermal Conductivity Testing of Insulating Materials (TOT-TM)

¥6,480-¥21,600
Laboratory Installation for Studying Heating Supply Systems (TOT-TSOP)

Laboratory Installation for Studying Heating Supply Systems (TOT-TSOP)

¥15,120-¥43,200
Laboratory Setup for Measuring Pump Efficiency and Pressure Characteristics (Centrifugal, Vortex, Peristaltic)

Laboratory Setup for Measuring Pump Efficiency and Pressure Characteristics (Centrifugal, Vortex, Peristaltic)

¥6,480-¥25,920
Laboratory Installation for Electrical Assembly and Adjustment of Refrigeration Unit (EE-HU)

Laboratory Installation for Electrical Assembly and Adjustment of Refrigeration Unit (EE-HU)

¥6,480-¥21,600
Laboratory Setup for Studying Three-Phase Transformer (EE-ZTRR)

Laboratory Setup for Studying Three-Phase Transformer (EE-ZTRR)

¥6,480-¥21,600
Air Conditioning System Training Stand VSK-KV

Air Conditioning System Training Stand VSK-KV

¥10,800-¥34,560
Sound Velocity Measurement Laboratory Setup (MF-SZT)

Sound Velocity Measurement Laboratory Setup (MF-SZT)

¥6,480-¥21,600
Educational Laboratory Setup for Theoretical Foundations of Electrical Engineering (EE-TOE)

Educational Laboratory Setup for Theoretical Foundations of Electrical Engineering (EE-TOE)

¥6,480-¥21,600

产品描述

Detailed study of all assemblies and operating modes of the refrigerating machine with air condenser. List of works to be performed on the training stand:

- Determination of cooling capacity, construction of the cycle of operation in a given mode.

- Studying the construction and testing of a freon refrigeration unit.

- Determination of the dependence of the refrigerating machine cold-productivity on the temperature mode of operation of the installation (to, tk).

- Study of refrigeration compressor design and determination of piston compressor parameters.

- Study of the air condenser design and determination of its heat transfer coefficient.

- Testing of refrigeration plant operation in the regenerative cycle. Study of the design of recuperative heat exchanger

相关产品

Refrigeration System Study Laboratory Stand ELB - 171.042.02

Refrigeration System Study Laboratory Stand ELB - 171.042.02

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
ENERGIYALAB LLC 🇷🇺
Heating System Study Setup for Liquid Fuel (ЖКХ-СОЖТ)

Heating System Study Setup for Liquid Fuel (ЖКХ-СОЖТ)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Refrigeration Machine Training Stand (Frame Design) VSK-XM-R

Refrigeration Machine Training Stand (Frame Design) VSK-XM-R

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Vacuum Cooling and Phase Transition Study Setup (PAHP-VOF)

Vacuum Cooling and Phase Transition Study Setup (PAHP-VOF)

¥10,800-¥38,880 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Setup for Studying Radiative Heat Transfer (TOT-TI)

Laboratory Setup for Studying Radiative Heat Transfer (TOT-TI)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
High-Performance Heating System HOT PLATE 350

High-Performance Heating System HOT PLATE 350

¥3,024-¥10,800 CNY
Industrial equipment
Factory direct from Russia
SAS LLC 🇷🇺
Laboratory Installation for Studying Heating Supply Systems (TOT-TSOP)

Laboratory Installation for Studying Heating Supply Systems (TOT-TSOP)

¥15,120-¥43,200 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Ventilation System Study Unit (PAHP-VS)

Laboratory Ventilation System Study Unit (PAHP-VS)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Scrubber VM-L for Air Purification

Laboratory Scrubber VM-L for Air Purification

¥10,800-¥79,200 CNY
Industrial equipment
Factory direct from Russia
URALAKTIV LLC 🇷🇺
Air Conditioning System Training Stand VSK-KV

Air Conditioning System Training Stand VSK-KV

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Refrigeration Technology Laboratory Setup PAKH-13

Refrigeration Technology Laboratory Setup PAKH-13

¥6,480-¥21,600 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Setup for Studying Refrigeration Machine (Frame Design) PAKH-XM-GK-R

Laboratory Setup for Studying Refrigeration Machine (Frame Design) PAKH-XM-GK-R

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Refrigeration Chamber Training Stand UCDE-24

Refrigeration Chamber Training Stand UCDE-24

¥15,120-¥43,200 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Refrigeration Machine Training Stand (VSK-XM)

Refrigeration Machine Training Stand (VSK-XM)

¥12,960-¥43,200 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Setup for Studying Refrigeration Machine Operation (Extended Modification) PAKH-XM-R

Laboratory Setup for Studying Refrigeration Machine Operation (Extended Modification) PAKH-XM-R

¥15,120-¥43,200 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Setup for Studying Refrigeration System Operation with Air Condenser and Dual Evaporators

Laboratory Setup for Studying Refrigeration System Operation with Air Condenser and Dual Evaporators

¥6,480-¥21,600 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Heating Systems Study and Monitoring Laboratory Setup (ЖКХ-УРСО)

Heating Systems Study and Monitoring Laboratory Setup (ЖКХ-УРСО)

¥6,480-¥21,600 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Cooling System Study Setup with Hermetic Compressor (PAHP-XM-GK)

Laboratory Cooling System Study Setup with Hermetic Compressor (PAHP-XM-GK)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Laboratory Setup for Studying Refrigeration Machine Operation with Liquid Chiller (PAHP-XM-LC)

Laboratory Setup for Studying Refrigeration Machine Operation with Liquid Chiller (PAHP-XM-LC)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Refrigeration Machine Stand with Automatic Control and Measurement System (VSK-CAU)

Refrigeration Machine Stand with Automatic Control and Measurement System (VSK-CAU)

¥10,800-¥34,560 CNY
Industrial equipment
Factory direct from Russia
TRIMBIRT LLC 🇷🇺
Request via WhatsApp