产品 — 电源与配电

DC Converter Transformers for Electrified Railways TРДТНП-16000/110 Ж

DC Converter Transformers for Electrified Railways TРДТНП-16000/110 Ж

¥648,000-2,592,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Oil-Filled Transformers 10000-80000 kVA, 110 kV

Three-Phase Oil-Filled Transformers 10000-80000 kVA, 110 kV

¥648,000-12,960,000
ELMAS (UETM) LLC 🇷🇺
High Voltage Measurement Transformers ZNG-UETM®-500 up to 16 kVA

High Voltage Measurement Transformers ZNG-UETM®-500 up to 16 kVA

¥64,800-216,000
ELMAS (UETM) LLC 🇷🇺
Voltage Measuring Transformers for Electric Devices ZNG-UETM®-500

Voltage Measuring Transformers for Electric Devices ZNG-UETM®-500

¥64,800-216,000
ELMAS (UETM) LLC 🇷🇺
Voltage Measuring Transformers ZNG-UETM®-500 for Electrical Equipment

Voltage Measuring Transformers ZNG-UETM®-500 for Electrical Equipment

¥64,800-259,200
ELMAS (UETM) LLC 🇷🇺
High Voltage Measuring Transformer ZNG-UETM®-110 up to 16 kVA

High Voltage Measuring Transformer ZNG-UETM®-110 up to 16 kVA

¥21,600-129,600
ELMAS (UETM) LLC 🇷🇺
High Voltage Measuring Transformers ZNG-UETM®-220, up to 16 kVA

High Voltage Measuring Transformers ZNG-UETM®-220, up to 16 kVA

¥64,800-259,200
ELMAS (UETM) LLC 🇷🇺
Embedded Current Transformers TVG-UETM®-750

Embedded Current Transformers TVG-UETM®-750

¥216-1,296
ELMAS (UETM) LLC 🇷🇺
High Voltage Gas Insulated Current Transformers TRG-UETM®-750

High Voltage Gas Insulated Current Transformers TRG-UETM®-750

¥64,800-216,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Oil-Filled Dual-Winding Transformer TDC-160000/110-10.5

Three-Phase Oil-Filled Dual-Winding Transformer TDC-160000/110-10.5

¥864,000-3,456,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Oil Transformer TDCNT-100000/110

Three-Phase Oil Transformer TDCNT-100000/110

¥1,080,000-3,456,000
ELMAS (UETM) LLC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
Three-Phase Dry Two-Winding Transformer TRSZP-2500/10 J

Three-Phase Dry Two-Winding Transformer TRSZP-2500/10 J

¥10,800-34,560
ELMAS (UETM) LLC 🇷🇺
Three-Phase Dry Dual-Winding Transformer TRSZP-3200/10

Three-Phase Dry Dual-Winding Transformer TRSZP-3200/10

¥10,800-34,560
ELMAS (UETM) LLC 🇷🇺
Three-Phase Dry Two-Winding Transformer TRSZP-12500/10 J

Three-Phase Dry Two-Winding Transformer TRSZP-12500/10 J

¥216,000-864,000
ELMAS (UETM) LLC 🇷🇺
Single-Phase Dry Two-Winding Autotransformer AOCZJ-16000/27*2

Single-Phase Dry Two-Winding Autotransformer AOCZJ-16000/27*2

¥302,400-1,080,000
ELMAS (UETM) LLC 🇷🇺
Power Oil Transformers for Voltage Class 35-220 kV, IBPD.672537.103 TU

Power Oil Transformers for Voltage Class 35-220 kV, IBPD.672537.103 TU

¥432,000-8,640,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Oil Transformer TDTNJ-40000/220 VM

Three-Phase Oil Transformer TDTNJ-40000/220 VM

¥648,000-2,160,000
ELMAS (UETM) LLC 🇷🇺
High Voltage Dry Transformers for Industrial Applications

High Voltage Dry Transformers for Industrial Applications

¥216,000-1,296,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Dry Two-Winding Transformer TRSZP-12500/35 J

Three-Phase Dry Two-Winding Transformer TRSZP-12500/35 J

¥302,400-1,080,000
ELMAS (UETM) LLC 🇷🇺
High Voltage Oil Transformers for Power Distribution

High Voltage Oil Transformers for Power Distribution

¥216,000-1,296,000
ELMAS (UETM) LLC 🇷🇺
Three-Phase Oil-Filled Dual-Winding Transformer TRDP-12500/35J

Three-Phase Oil-Filled Dual-Winding Transformer TRDP-12500/35J

¥648,000-2,160,000
ELMAS (UETM) LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.