Mahsulotlar — Elektr ta'minoti va taqsimoti

Tashqi tomon rotor sensori ushlagichi 20-031058

Tashqi tomon rotor sensori ushlagichi 20-031058

so'm 37,800-226,800
ROSISOLIT LLC 🇷🇺
BRIT-R-90-110-550/800 KN Transformer Input with Solid Insulation

BRIT-R-90-110-550/800 KN Transformer Input with Solid Insulation

so'm 18,900,000-60,480,000
H ENERGY LLC 🇷🇺
Complete Block Transformer Substation KTPB-TE 6(10)-220 kV UHL1

Complete Block Transformer Substation KTPB-TE 6(10)-220 kV UHL1

so'm 1,134,000,000-7,560,000,000
T-ENERGY LLC 🇷🇺
Past kuchli to'plam qurilmasi

Past kuchli to'plam qurilmasi

so'm 11,340,000-226,800,000
VIBRATOR OJSC 🇷🇺
Current Transformers TSHL-0.66; TSHL-0.66-I; TSHL-0.66-II

Current Transformers TSHL-0.66; TSHL-0.66-I; TSHL-0.66-II

so'm 113,400-1,058,400
SZTT OJSC 🇷🇺
High-Frequency Interference Suppressor AVLB.672861.011

High-Frequency Interference Suppressor AVLB.672861.011

so'm 11,340,000-45,360,000
CJSC "NPO "EIS" 🇷🇺
Elektr energiya tizimlari, kemalar uchun elektr ta'minoti tizimlari RSD59 loyihasi uchun

Elektr energiya tizimlari, kemalar uchun elektr ta'minoti tizimlari RSD59 loyihasi uchun

so'm 113,400,000-756,000,000
SHIP SERVICE LLC 🇷🇺
O'zgaruvchan kuchlanish manbai B2-9

O'zgaruvchan kuchlanish manbai B2-9

so'm 11,340,000-37,800,000
TECHNOYAKS OJSC 🇷🇺
Transformator

Transformator

so'm 11,340,000-75,600,000
PZT LLC 🇷🇺
High Voltage Transformer Bushing BRIT-90-170-750/800 KN 1.9.020

High Voltage Transformer Bushing BRIT-90-170-750/800 KN 1.9.020

so'm 11,340,000-37,800,000
H ENERGY LLC 🇷🇺
Current Transformers TShP-0.66 for Accurate Metering

Current Transformers TShP-0.66 for Accurate Metering

so'm 1,134,000-3,780,000
SZTT OJSC 🇷🇺
Modular Floor Distribution Device UERM, Height 160mm to 1200mm

Modular Floor Distribution Device UERM, Height 160mm to 1200mm

so'm 1,890,000-22,680,000
Continent ETS LLC 🇷🇺
Tashqi tomondan rotor sensorini ushlagich 20-031058

Tashqi tomondan rotor sensorini ushlagich 20-031058

so'm 37,800-226,800
LABARA-RUS LLC 🇷🇺
Energiya to'plam tizimi (ETT)

Energiya to'plam tizimi (ETT)

so'm 1,134,000,000-12,096,000,000
SPT LLC 🇷🇺
Yuqori kuchli transformator

Yuqori kuchli transformator

so'm 37,800,000-756,000,000
PZT LLC 🇷🇺

Container Energy Storage System for Solar Power - 4xPN-690-C1-250-216-1-BM-UXHL1

so'm 1,134,000,000-3,780,000,000
LIOTECH-INNOVATIONS LLC 🇷🇺
Electricity Transmission System for Efficient Power Distribution

Electricity Transmission System for Efficient Power Distribution

so'm 7,560,000-1,512,000,000
Kulakov Plant OJSC 🇷🇺
Three-Phase Voltage Transformers NALI-EC-24 M7P

Three-Phase Voltage Transformers NALI-EC-24 M7P

so'm 18,900,000-68,040,000
ELECTROSHIT-K° LLC 🇷🇺
BRIT-90-110-550/2000 KN Transformer Bushing for High Voltage

BRIT-90-110-550/2000 KN Transformer Bushing for High Voltage

so'm 18,900,000-60,480,000
H ENERGY LLC 🇷🇺
TTNK - Kombinatsiyalangan tok va kuchlanish transformatori

TTNK - Kombinatsiyalangan tok va kuchlanish transformatori

so'm 113,400,000-453,600,000
PROFOTEK OJSC 🇷🇺
VKU1.000 Aylanadigan aloqa qurilmasi

VKU1.000 Aylanadigan aloqa qurilmasi

so'm 11,340,000-45,360,000
ELECTROMASHINA OJSC 🇷🇺
Three-Phase Anti-Resonance Voltage Transformer Group 3хЗНОЛ.04П

Three-Phase Anti-Resonance Voltage Transformer Group 3хЗНОЛ.04П

so'm 18,900,000-60,480,000
SZTT OJSC 🇷🇺
BRIT-S-90-110-550/2000 KN Transformer Bushing Type

BRIT-S-90-110-550/2000 KN Transformer Bushing Type

so'm 18,900,000-60,480,000
H ENERGY LLC 🇷🇺
Gazni tartibga soluvchi blok - GTPB

Gazni tartibga soluvchi blok - GTPB

so'm 189,000,000-756,000,000
PJSC GAZPROM GAZORASPREDELENIE UFA 🇷🇺
High Voltage Transformer Bushing BRIT-90-220-1050/2000 KN 2.9.003U

High Voltage Transformer Bushing BRIT-90-220-1050/2000 KN 2.9.003U

so'm 113,400,000-378,000,000
H ENERGY LLC 🇷🇺
VKU330-4.000 Aylanadigan kontakt qurilmasi

VKU330-4.000 Aylanadigan kontakt qurilmasi

so'm 11,340,000-45,360,000
ELECTROMASHINA OJSC 🇷🇺
Tashqi tomondan rotor sensorini ushlagich 20-031058

Tashqi tomondan rotor sensorini ushlagich 20-031058

so'm 37,800-226,800
ELECTROCOMPOSIT LLC 🇷🇺
Energy Consumption Optimizer OEP-3

Energy Consumption Optimizer OEP-3

so'm 18,900,000-113,400,000
Energy Optimum LLC 🇷🇺
Ceiling Power Supply System ST SEP-32

Ceiling Power Supply System ST SEP-32

so'm 11,340,000-75,600,000
SOYUZTEHNOLOGIYA LLC 🇷🇺
O'zgaruvchan kuchlanish manbai B2-7

O'zgaruvchan kuchlanish manbai B2-7

so'm 1,890,000-6,804,000
TECHNOYAKS OJSC 🇷🇺
RPB (Taqsimlash nuqtasi blokli)

RPB (Taqsimlash nuqtasi blokli)

so'm 226,800,000-1,512,000,000
TRANSFORMER URAL LLC 🇷🇺
Current Transformers TSHPTC-0.66 for Measurement and Control

Current Transformers TSHPTC-0.66 for Measurement and Control

so'm 113,400-756,000
TRANSVIT OJSC 🇷🇺
Uch fazali ventilyatorlar tezligini nazorat qiluvchi RSVT7

Uch fazali ventilyatorlar tezligini nazorat qiluvchi RSVT7

so'm 1,134,000-3,780,000
Contact OJSC 🇷🇺
Avtonom elektr ta'minoti tizimi (AETT) 39X6M1

Avtonom elektr ta'minoti tizimi (AETT) 39X6M1

so'm 1,134,000,000-4,536,000,000
PRZ OJSC 🇷🇺
Transformatorli kiritish turi BRIT-90-110-550/2000 KН 1.9.001U

Transformatorli kiritish turi BRIT-90-110-550/2000 KН 1.9.001U

so'm 18,900,000-60,480,000
H ENERGY LLC 🇷🇺
Elektr energiya Sever-Soleninskoye GKM

Elektr energiya Sever-Soleninskoye GKM

so'm 756,000,000-7,560,000,000
NORILSKGAZPROM OJSC 🇷🇺
Elektr jihozlari komplekti EVP-110-04

Elektr jihozlari komplekti EVP-110-04

so'm 113,400,000-378,000,000
PTM LLC 🇷🇺
Transformatorli kiritish turi BRIT-S-90-110-550/2000 КН 1.9.001-AS

Transformatorli kiritish turi BRIT-S-90-110-550/2000 КН 1.9.001-AS

so'm 18,900,000-60,480,000
H ENERGY LLC 🇷🇺
21-523-05 Trolley shinozvod 4/140A, 3 metr, kesimi 3,3mm, 4 shina bilan

21-523-05 Trolley shinozvod 4/140A, 3 metr, kesimi 3,3mm, 4 shina bilan

so'm 189,000-529,200
MODERN TECHNOLOGIES LLC 🇷🇺
RPN kuch transformatorlari uchun holat ko'rsatkichlari SHUP96

RPN kuch transformatorlari uchun holat ko'rsatkichlari SHUP96

so'm 1,890,000-6,804,000
ELECTROPRIBOR OJSC 🇷🇺
RPN joylashuv ko'rsatkichlari ЩУП120

RPN joylashuv ko'rsatkichlari ЩУП120

so'm 2,268,000-9,072,000
ELECTROPRIBOR OJSC 🇷🇺
Elektron blok

Elektron blok

so'm 37,800-7,560,000
ZMT LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.