Kuch transformatorlari
Tok o'lchov transformatorlari
Kuchlanish o'lchov transformatorlari
Maxsus transformatorlar
Uzluksiz quvvat manbalari (UPS)
Kuchlanish stabilizatorlari
Quvvat manbalari va modullari
O'zgartirgichlar, invertorlar, to'g'rilagichlar
Chastota o'zgartirgichlari
O'lchov o'zgartirgichlari
KRU va NKU taqsimlash qurilmalari
Komplekt transformator podstantsiyalari (KTP)
Starter akkumulyator batareyalari
Stansionar va lityum-ion akkumulyatorlar
Quyosh elektr stansiyalari va fotomodullar
Elektr ta'minoti tizimlari
Zaxiralangan ikkilamchi elektr manbalari
Kuch rozetkalari va kolonkalari
Elektromobillar uchun zaryadlash stansiyalari
Boshqa
Mahsulotlar — Elektr ta'minoti va taqsimoti
Current Transformer TLP-10-5 M2 for Distribution Systems
so'm 1,134,000-4,536,000
ELECTROSHIT-K° LLC 🇷🇺
Current Transformer T-0.66, TSh-0.66 - Signal Transmission & Isolation
so'm 378,000-7,560,000
ST OJSC 🇷🇺
TTEO-Sh - Elektron optik tok transformatori (shina bajarilishi)
so'm 37,800,000-226,800,000
PROFOTEK OJSC 🇷🇺
Current Transformer TShP-0.66-IV for Measurement and Protection
so'm 1,134,000-6,804,000
SZTT OJSC 🇷🇺
Current Transformer TLP-10-1 M1 for Distribution Systems
so'm 1,134,000-3,780,000
ELECTROSHIT-K° LLC 🇷🇺
Current Transformers TOL-110 III for Measurement and Protection
so'm 11,340,000-45,360,000
SZTT OJSC 🇷🇺
TTEO-G - Elektron optik tok transformatori moslashuvchan sezgir element bilan
so'm 11,340,000-45,360,000
PROFOTEK OJSC 🇷🇺
Current Transformer TOL-SVEL with Cast Insulation for Voltage Classes 3 to 35 kV
so'm 11,340,000-45,360,000
SVEL Group OJSC 🇷🇺
Current Transformer TL-EK-35 M2 for Outdoor Distribution Units
so'm 3,780,000-22,680,000
ELECTROSHIT-K° LLC 🇷🇺
Current Transformer TLP-10-3 M1 for Substation Applications
so'm 1,134,000-3,780,000
ELECTROSHIT-K° LLC 🇷🇺
Transformator toka T-0,66 M 10 VA 0,5 2000/5
so'm 113,400-453,600
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toki TOP -0,66 10 VA 0,5 S 250/5
so'm 37,800-226,800
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toki TShP-0,66 5 VA 0,5 1500/5
so'm 113,400-453,600
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toki o'rnatilgan TV-ZTM 0,66 kV kuchlanish sinfi, nominal birlamchi tok 50 dan 40000 A gacha (ichida l
so'm 378,000-7,560,000
ZTM LLC 🇷🇺
Transformator toki TShP-0,66 5 VA 0,5 S 300/5
so'm 22,680-75,600
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toki TOP -0,66 10 VA 0,5 80/5
so'm 37,800-226,800
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toka T-0,66 M 10 VA 0,5 S 1200/5
so'm 37,800-226,800
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toki TOP-0,66 5 VA 0,5 S 150/5
so'm 113,400-453,600
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Transformator toka TShP -0,66 10 VA 0,5 S 750/5
so'm 37,800-226,800
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
FAQ
•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.