Vibro hopper

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The vibro hopper is designed to feed material in the form of powder for explosive thermal evaporation in vacuum.
Explosive evaporation allows the evaporation of alloys and compounds, including multi-component ones with widely differing component pressures.
The stoichiometry of the starting material is maintained in the sputtered layer.
This is achieved by feeding the powder onto a superheated surface, so that each grain is vaporised immediately, ensuring that the material is transferred to the substrate in the original ratio of components.

Supplied complete with vibrating bunker: LCMK.350.00.00.00.00.000 RE VIBROBUNKER power supply unit.
Operation manual is available on request: LCMK.253.00.00.00.00.000 RE VIBROBUNKER.

Specifications

Assignment Feeding of material in powder form for explosive thermal vaporisation in vacuum.
Dustproof Check - Enclosure is made of metal, no exposed live parts.
Type of construction Stationary
Warranty period 1 a
Climatic designs OST 15150-69; GOST 15543-70 at normal values of climatic factors of external environment - UHL for product placement category 4.2.
Power supply voltage 220 V
Output frequency 0...100
Data transfer protocol ModBus RTU
Interface RS-485
Overall dimensions, (length x base diameter x height) 83 x ?52 x 72 mm
Weight, not more 0,25 kg

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.