1
Request Details
2
Contact Info

What do you need?

Describe the product or service you are looking for

Your Contact Information

We will contact you as soon as possible

Request Submitted!

Thank you! We will contact you soon with the best offers.

TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

Brand: UTZ
$1,500,000 - $4,800,000 USD
MOQ: 1 pieces

Key Features

Rated power: 124.9 m³
Nominal fresh steam flow rate: 524 hp
Nominal heat load: 150 g/kWh
Assignment: For generating electricity and steam as part of a steam power unit

More from UTZ

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

$900,000-$3,000,000
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

$90,000-$360,000
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

$900,000-$3,000,000
High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

$90,000-$600,000
Steam Turbine Modernization Kit T-100

Steam Turbine Modernization Kit T-100

$60,000-$600,000
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

$30,000-$180,000
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

$1,500,000-$4,800,000
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

$1,500,000-$4,800,000

Description

Turbine TP-124-12,8-NG belongs to class B.1 - three-cylinder turbines. The turbine is a single-shaft three-cylinder unit with two adjustable heating steam outlets and is designed to drive a turbine generator, to provide heat load up to 190 Gcal/h and auxiliary steam for CHPP up to 90 t/h.
The high-pressure cylinder (HPC) has a two-hull design with a straight flow scheme.
The turbine is a unique development - the secret of production of JSC "UTZ" with patented turbine units.

Specifications

Rated power
124.9 m³
Nominal fresh steam flow rate
524 hp
Nominal heat load
150 g/kWh
Assignment
For generating electricity and steam as part of a steam power unit
Designation
??-124-12;8-ng
Name
steam turbine tp-124-12;8-ng
Maximum condensing power
124.9 m³
Maximum fresh steam flow rate
570 hp
Temperature
555 million m³
Maximum heat load
188 g/kWh
Pressure
12.8 thous. t storage

Related Products

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

$900,000-$3,000,000 USD
Rated power: 66
Maximum heat load: 143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

$90,000-$360,000 USD
Fresh steam consumption: 330
Fresh steam pressure: 12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

$900,000-$3,000,000 USD
Maximum power: 220
Pressure: 12.8
UTZ OJSC 🇷🇺
Complete K-330-23.5-1R Steam Turbine for Power Unit 4

Complete K-330-23.5-1R Steam Turbine for Power Unit 4

$300,000-$1,800,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

$42,000-$150,000 USD
Electric power: B1/B8 2100/900 MHz
Absolute vapor pressure: 3
PJSC KALUGA TURBINE PLANT 🇷🇺
K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

$900,000-$3,000,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Energy Steam Turbine for Electric Generators 1.4MW to 80MW

Energy Steam Turbine for Electric Generators 1.4MW to 80MW

$180,000-$1,800,000 USD
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
PJSC KALUGA TURBINE PLANT 🇷🇺
Complete PT-60/70-130/7 Steam Turbine for Power Generation

Complete PT-60/70-130/7 Steam Turbine for Power Generation

$900,000-$3,600,000 USD
Nominal fresh steam flow rate: 96.7
Absolute pressure of fresh steam upstream of the stop valves of CVD: 12.75
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

$900,000-$3,000,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of steam after superheating before stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

$30,000-$180,000 USD
Rated power: 16
Assignment: Drive of electric alternator
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

$1,500,000-$4,800,000 USD
Rated power: 150
Maximum condensing power: 160
UTZ OJSC 🇷🇺
Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

$1,500,000-$4,800,000 USD
Rated electrical power: 190
Acute vapor pressure: 12.8
SILOVYE MASHINY OJSC 🇷🇺
K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

$900,000-$3,600,000 USD
Rated power of turbine: 850
Temperature of steam after superheating before DDC stop valves: 542
SILOVYE MASHINY OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

$90,000-$300,000 USD
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation

Steam Turbine R-50-12.8/1.5 for Power Generation

$90,000-$300,000 USD
Assignment: for electricity and steam generation
Assignment: for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

$1,500,000-$4,800,000 USD
Rated power: 120
Steam consumption: 540
UTZ OJSC 🇷🇺

Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation

$90,000-$600,000 USD
Power: 1340...34000
Absolute pressure of fresh steam: 1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine Diaphragm 30 Stages Model 47T230-3219

Steam Turbine Diaphragm 30 Stages Model 47T230-3219

$9,000-$30,000 USD
Overall dimensions (diameter): 2950
Overall dimensions (width): 420
UK TES LLC 🇷🇺
Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

$150-$420 USD
Jaw width: 160
Workpiece clamping force: 54000
ARMORICA LLC 🇷🇺
Graphite Electrodes EGSP-UNP Diameter 520 mm and More 650 mm

Graphite Electrodes EGSP-UNP Diameter 520 mm and More 650 mm

$900-$3,000 USD
Diameter: 710
Length: 1500
EL 6 LLC 🇷🇺
Request via WhatsApp