SSC - starting bellows axial compensator for heat networks under welding with nominal pressure PN 25 Bar; DN from 50mm to 1

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The starting bellows compensator SSC of the hortum trade mark serves for compensation of axial displacements arising due to thermal expansion of pipelines of ductless underground heating networks. The starter compensator fulfils its function only once: when the pipeline is first heated up, the bellows compensates for the thermal expansion caused by the change in temperature of the heating medium and is compressed, after which its casing is fixed by a welded seam. The thickness of the outer casing is selected in such a way as to exclude the possibility of movement (elongation/compression) after its fixation. The company designs and manufactures bellows compensators to order, depending on the specifics of the project, according to the technical requirements of the customer. Design engineers of the plant help with the arrangement of bellows compensators, guides and fixed supports, as well as provide technical support at all stages of operation.

Specifications

Number of bellows layers: Laminated
Number of sections: Single section (one bellows)
Accession Type: For welding. Available with other end fittings: flange connection, threaded connection.
Compensator design: Protective telescopic guard
Nominal diameter (DN) 1200 mm
Pressure Pb (PN) 25
Operating medium temperature 150 °C
Type of stroke Axial
Additionally Can be manufactured to customer specifications.
LIMITED TIME

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.