
Shelving units "S-HEAVY"
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Racks with roll-out platforms S-HEAVY. They are suitable for equipping workshops, warehouses, terminals. These systems are designed specifically to provide convenient and safe storage of heavy loads. Convenience is achieved by means of pull-out platforms, which facilitate loading and unloading operations thanks to the possibility of using a crane-beam.
Safe storage of heavy loads. The design completely excludes tipping of the rack.
Use of lifting equipment (crane-beam).
Convenience of operation. The platform can be extended by hand. Additionally, the rack can be equipped with a manual hoist.
Installation on a concrete floor. The rack has high stability, but in order to completely exclude tipping of the loaded structure, the slope of the floor should not be more than 2 mm per metre.
Safe storage of heavy loads. The design completely excludes tipping of the rack.
Use of lifting equipment (crane-beam).
Convenience of operation. The platform can be extended by hand. Additionally, the rack can be equipped with a manual hoist.
Installation on a concrete floor. The rack has high stability, but in order to completely exclude tipping of the loaded structure, the slope of the floor should not be more than 2 mm per metre.
Specifications
Type of product according to PP RF 616
Metal furniture, not included in other groupings
Weight
400...1500 kg
Height
1500...2000 mm
Width
900...1800 mm
Depth
750...1200 mm
Structural load
1000...3000 kg
Color
RAL7035
Warranty
2 a
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Shipboard metal furniture. RBPG waste tank
View Details
Sheffilton SHT-T35 70/50 table
View Details
Metal cabinet for one fire extinguisher, floor standing, single, square (type No.5)
View Details
Cabinet for storing CDs
View Details
Cupboard (hinged cupboard): LK-1200 SHN (STEEL)
View Details
Double-deck double-sided metal sheds
View Details
Automated document storage system module
View Details
Metal single-deck single-sided benches NZS-948-4/1 (NZS-4.111) / NR111 (type IV B-948.00.00.000-02)
View Details
Rack for plates PKT1
View Details
Wardrobe bench G.9
View Details
Universal transformable table of SUT model. 28
View Details
Hinged cupboard 1200 SHS
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions