Separating transformers of galvanic isolation SKAT GF series

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

Designed to protect against dangerous voltage of telecommunication, production, server, security and fire and other equipment in the network 220 V, 50 Hz. The device physically separates the input network and the load, which makes it possible to significantly improve the quality of power supply and protection of equipment (power supplies, inverters, servers, switches, etc.). Eliminates the influence of parasitic currents dangerous for personnel and expensive equipment, eliminates harmful AC and DC potential between network wires and ground. Placed in 19" telecoms cabinets and racks.

Specifications

Rated power 1000...10000 W
Full power 1000...10000
Active power 1000...10000 W
Nominal input voltage 240 V
Rated output voltage 240 V
Protection class IP20
Number of IEC 60320 C19 output sockets 1 pc
Reducing input voltage without switching to battery use 110 V
Output connection 1Ph+N+PE
Input connection 1Ph+N+PE
Increasing the input voltage without switching to battery use 300 V
Presence of terminal output no
Maximum ambient temperature 40 °C
Maximum ambient relative humidity 95 %
Availability of additional functions Overload and short circuit protection
Mains power consumption without load 15...500
Maximum input current 5.3...50 A
AC output voltage range 170...250 V
AC input voltage range 110...300 V

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.