PTK SAU GTE-110M

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

PTC SAU GTE-110M (software and hardware complex of automatic control system of gas turbine power plant with an electrical capacity of 110MW) is a distributed information and control man-machine system based on the Russian basic PTC "INCONT", designed for long-term operation in real time with the necessary speed.
PTC SAU GTE-110M is designed for automated control and management of technological processes, to perform the functions of technological protections and interlocks of GTE, as well as to provide operational and technical personnel with the necessary technological information, obtaining calculation parameters, creating and maintaining archives, preparing and printing protocols and other operational documentation, monitoring and control of technological and electrical equipment of GTE.

Specifications

Interface type Human-machine control interface
Composition Gas turbine engine and turbogenerator connected by shaft; drive box on frame; air duct snail; exhaust pipe; oil tank; air unit; fuel gas unit
Structure Two-level PTC hierarchy
Coefficient of efficiency at rated power at turbine generator terminals Built-in memory card slot, support microSD/SDHC/SDXC card (up to 256GB); manual recording/alarm recording %
Functions performed by the system Information, control, auxiliary, polling and primary signal processing, information display, technological signalling, registration of current information, remote control, automatic regulation, logical control, technolo
Software Typical libraries of monitoring, control and automatic regulation tasks; typical libraries of graphical human-machine interface elements; typical libraries of tasks for generation, viewing and documentation of archives, protocols of events, reports and
Rated power at turbo generator terminals 115
Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.