
Pipeline protection device against induced alternating current TU 3435-005-93719333-2010
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Pipeline protection device against induced alternating current (UZT), designed for continuous long-term withdrawal of alternating current (up to 40A or 80A, the maximum withdrawable current of 50 Hz during 1 s. not less than 400A), induced as a result of electromagnetic influence of high-voltage power lines and other sources of high voltage.
The UZT is an element of the system of electrochemical protection (ECP) of pipelines against corrosion. The UZT does not affect the protective potential of the pipeline EHS (it prevents leakage of the protective potential of the EHS through the grounding of the UZT, the leakage current is not more than 0.1 A) and allows measuring the diverted alternating current.
The UZT is protected against impulse overvoltages by a lightning protection device for impulse current up to 100 kA.
The UZT is an element of the system of electrochemical protection (ECP) of pipelines against corrosion. The UZT does not affect the protective potential of the pipeline EHS (it prevents leakage of the protective potential of the EHS through the grounding of the UZT, the leakage current is not more than 0.1 A) and allows measuring the diverted alternating current.
The UZT is protected against impulse overvoltages by a lightning protection device for impulse current up to 100 kA.
Specifications
Maximum permissible DC voltage
18 V
Nominal AC output current
40 A
Maximum withdrawable current 50 Hz for 1 sec
400 A
Maximum DC leakage current
0.001 A
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Shipboard distribution switchboard
View Details
SHET-SHERA series relay protection and automation cabinets
View Details
Telemechanics controller cabinet INBRES-SHTM
View Details
Instrumentation and control centre type 16 KIP.PTM
View Details
Motor control centres
View Details
Control cabinet SR Street Control & Registration (three-phase)
View Details
Anode extended type 2 (APr.PTM.2)
View Details
Front and rear socket elements ZA 100.00 v.2
View Details
Input-distributing switchboard ShchVR-40-SK-V-1(m/r)
View Details
Complete low-voltage control devices for electric drives of mining excavators. Type NKUE-10MK
View Details
Type 1 extended anode (APr.PTM.1)
View Details
IU - control box
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions