
Outdoor lighting control cabinet NORLED Division IO BOX 3P
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Designed for operation in three-phase networks, for power distribution for several lines of lighting equipment.
Provides:
- control of lighting in settlements, on highways and motorways according to a given annual schedule, through control from the dispatching centre and in manual mode;
- centralised control and management of outdoor lighting via GSM and/or L-LoRa and/or Ethernet,
- collection and transmission of data on energy consumption of objects in order to organise electricity metering and equipment diagnostics.
Climatic version - UHL1
IP66 version in accordance with GOST 14254-2015.
Overall dimensions of SHUNO (W×HH) 600800×285 mm.
Weight - not more than 60 kg.
Supply voltage of three-phase SHUNO 380V±10%, AC frequency 50 Hz.
Provides:
- control of lighting in settlements, on highways and motorways according to a given annual schedule, through control from the dispatching centre and in manual mode;
- centralised control and management of outdoor lighting via GSM and/or L-LoRa and/or Ethernet,
- collection and transmission of data on energy consumption of objects in order to organise electricity metering and equipment diagnostics.
Climatic version - UHL1
IP66 version in accordance with GOST 14254-2015.
Overall dimensions of SHUNO (W×HH) 600800×285 mm.
Weight - not more than 60 kg.
Supply voltage of three-phase SHUNO 380V±10%, AC frequency 50 Hz.
Specifications
Climatic version
UHL1
Housing material
Metal
Height
800 mm
Width
600 mm
Power supply voltage
380 V
Rated current
32 A
Degree of protection against external influences
IP66
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Electrical cabinets SHE series
View Details
Electric power supply and protection unit BPZ-2M
View Details
Anodic earthing electrode AZ.PTM deep with working element on the basis of titanium with mixed metal oxide coating complete Ti
View Details
EKRA 050 series microprocessor terminals
View Details
DRP-100 digital devices (DRP-101-L, DRP-101-CP, DRP-102-L, DRP-103-B, DRP-103-C, DRP-104-TH, DRP-105-DD, DRP-100-RPN, DRP-10
View Details
Main switchboard GRShch-SK-0,4kV-30...50kA-100...6300A-U3
View Details
Server cupboard MPP 200.60.100
View Details
Cabinets and control panels for power stations (SHUES, SHUES)
View Details
Server equipment cabinet INBRES-SHO-X
View Details
YARP-250A IP65
View Details
Charging-distributing board. (MNN.Ts480M2rd/NF.360066.023) TU 27.12.31-001-00578532-2023
View Details
Complete low-voltage relay protection and automation devices with microprocessor units of BEMP series.
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions