Milking installations into Milkline summer camp (UDLL)

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

1. The vacuum tube is made of galvanised steel, which allows to dismantle the summer milking for the winter period.2. All bends of the milk pipe are made of stainless steel pipe bends, which guarantees maximum milk quality.3. Vacuum regulator, Interpulse in combination with an enlarged vacuum receiver allows to completely exclude vacuum fluctuations during milking, which is one of the guarantees of absence of mastitis in cows.4. Optimal scheme of milk pipe and collapsible pipe fastening allows to dismantle the summer milking machine for the winter period and to install it for the next season by own efforts, without involvement of third-party organisations.5.All components of the summer milking machine are usually available in local agro-stores - in case of failure or breakage during dismantling in the post-warranty period of any element you will not have difficulties in its purchase.6. The design of the water ring vacuum unit allows you to reduce costs.7. Complete by agreement with the customer.

Specifications

Type of product according to PP RF 616 Milking machines
Models for number of heads 4...20 pc
Spare parts kit 1 pc
Set of fasteners 1 pc
Вакуумметр 3 pc
Water heater 1...6 pc
Milking machine 6...32 pc
Coupling for milk pipe connection. 20...60 pc
Molokovacuum crane 12...70 pc
Milk pipe 50...132 m
Milk metering device (counter for 4 milkers) 1...2 pc
Dispenser section 2...8 pc
Milk collector 1...2 pc
Vacuum pipe 50 18...51 pc
Вакуумрегулятор 1 pc
Vacuum receiver (100 litres) 1 pc
Vacuum unit 4 kW 1...3 pc

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.