
Magnetic pad holder MDPP-2
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Applied at one-sided automatic and manual electric arc welding with the use of forming copper lining plates. The fixture is favoured by bridge builders because of the significant time savings in preparation for the welding operation.
In the traditional technology, the pad holders are welded and this operation involves two fitters and a qualified welder, after welding the pad holders have to be dismantled and this again involves a qualified welder and fitters. When using the magnetic holder, two fitters can do the job 2.5 times faster than with conventional technology. The magnets are connected and disconnected in minutes and hold the plate securely in place.
MDFP-2 is used for more complex geometry of welded surfaces. According to experts' estimates, when using MDFP - 2, the working time saving is 2.5 hours for welding a 10-12 metre seam, and labour costs are reduced by 4.5 times.
In the traditional technology, the pad holders are welded and this operation involves two fitters and a qualified welder, after welding the pad holders have to be dismantled and this again involves a qualified welder and fitters. When using the magnetic holder, two fitters can do the job 2.5 times faster than with conventional technology. The magnets are connected and disconnected in minutes and hold the plate securely in place.
MDFP-2 is used for more complex geometry of welded surfaces. According to experts' estimates, when using MDFP - 2, the working time saving is 2.5 hours for welding a 10-12 metre seam, and labour costs are reduced by 4.5 times.
Specifications
Work surface size
60...90 mm
Force of attraction of each base
4500
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Lifting electromagnet EMG 115SM-Sv-IP68-U1
View Details
Lifting electromagnet EMG 115SM with lifting beam
View Details
Lifting electromagnet EMGS 110-60-42/AT-U1
View Details
Lifting electromagnet EMGK 105-70-54/A-U1 with crosshead PG6-4711
View Details
Electromagnets BB 400-15A T2
View Details
Electromagnet BB400-15 U2
View Details
Lifting electromagnet EMG 155SM
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions