Available for Import
Gas Turbine Engine GTD-8RM for Reliable Power Generation Solutions
Manufacturer:
PJSC "ODK-SATURN"
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
GTD-6RM and GTD-8RM are twin-shaft gas turbines for driving electric generators as part of thermal power plants of small and medium capacity (from 6 to 64 MW and above).
Design Features:
- 11-stage compressor
- tube-and-ring combustion chamber (12 flame tubes)
- 2-stage compressor turbine
- 4-stage power turbine
Benefits:
- high reliability of GTE-6/8RM is ensured by the reliability and operating experience of D-30KU/KP family aircraft engines
- total operating time of GTE-6/8RM in operation, as part of GTA and GTPP, is more than 3.5 million hours
- possibility of operation on different types of fuel: gaseous (natural gas, associated petroleum gas) and liquid (paraffin, diesel fuel)
- reduction of capital and operating costs due to unification of gas turbines GTD-6/8RM with aircraft engines D-30KU/KP.
Design Features:
- 11-stage compressor
- tube-and-ring combustion chamber (12 flame tubes)
- 2-stage compressor turbine
- 4-stage power turbine
Benefits:
- high reliability of GTE-6/8RM is ensured by the reliability and operating experience of D-30KU/KP family aircraft engines
- total operating time of GTE-6/8RM in operation, as part of GTA and GTPP, is more than 3.5 million hours
- possibility of operation on different types of fuel: gaseous (natural gas, associated petroleum gas) and liquid (paraffin, diesel fuel)
- reduction of capital and operating costs due to unification of gas turbines GTD-6/8RM with aircraft engines D-30KU/KP.
Specifications
EFFICIENCY (ISO 2314), %
25.5 %
Capacity (ISO 2314), MW
8.44
Weight (on frame), t
5.62 t
Height, m
2.5 m
Width, m
2.3 m
Length, m
3.4 m
Gas flow rate at the outlet, kg/s
51
Gas outlet temperature, °C
520 °C
Fuel consumption (at nominal mode), kg/hour
2385
Fuel used
gas ; diesel
N of output shaft, rpm
3000
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Gas Transfer Unit GPA-10RM for Efficient Gas Transport
View DetailsGas Turbine Drive Unit DO49R for Electric Generators
View DetailsMicro Gas Turbine Power Plant MGTU-100 for Autonomous and Backup Power Supply
View DetailsGas Turbine Engine GTE-110M
View DetailsGas Turbine Drive Unit PS-90GP-25 for Gas Transportation
View DetailsGas Turbine Drive Unit GTU-2.5 P
View DetailsGas Turbine Drive Installation NK-14ST-10 by Kuznetsov
View DetailsGas Turbine GTE-170 for Nizhnekamsk TPP
View DetailsGas Turbine Engine GТД-6.3PM for Compressors and Generators
View DetailsGas Turbine Drive Installation NK-14ST PАО "Kuznetsov
View DetailsAutomated Gas Pumping Unit GPA-4RM
View DetailsMarine Dual-Fuel Gas Turbine Engine E70/8RD
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions