Floor wardrobe system with shoe drawers (74 people). (School furniture brand "Interior" series "TDI School")

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

G Size of one double-sided wardrobe system (w x d x h), 4200x124x1800mm. The main panel is fixed on both sides and must be made of 16mm+/- 2mm thick chipboard and lined with 0.4-2mm thick PVC edging. Decorative overlays shall be attached to each main panel on both sides. On the panels on each side should be located metal hooks 37 pcs 3 horn (for outerwear) and 37 pcs 2 horn (for replacement shoes), there is a shelf for shoes size (depth x height), 250 x 450mm along the entire length of the wardrobe system on both sides, made of 16mm+/- 2mm thick chipboard and lined with 0.4-2mm thick PVC edging. The construction is fixed to a metal painted square profile pipe of 60x60 mm size, which is fixed for reliability and stability of the construction by anchor bolts to the floor and ceiling. Profile pipe for one wardrobe system is not less than 5 pieces. Colour as agreed with the customer.

Specifications

Type Stationary, Mobile
Frame type Wooden; metal
Type of clothing placement Hook
Number of sections 1...20 pc
Total number of hangers/shoulders/hooks 1...200 pc
Section configuration Bench; Shoe drawer; Hat rack; Clothing numbers
Type of section attachment Wall and ceiling; Wall and floor; Floor and ceiling; Floor and ceiling; Ceiling; Flooring
Availability of a rack for issuing clothes Yes; no
Availability of section facade yes;no
Type of material for the façade of the clothes dispensing section and rack lspc; mdf
Type of product according to PP RF 616 Racks, racks, metal hangers

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.