Complete transformer substations (160 ... 2500 kW)
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Available Models
Description
Komplete transformer substations are designed to receive and convert electrical energy of three-phase alternating current frequency of 50 and 60 Hz.
Field of application
Used for power supply of objects in industry, power engineering, oil and gas industry, construction industry, etc.
Equipment composition
KTP includes: switchgear on the high voltage side (HV side), power transformers, low-voltage complete devices (LVD) on the low voltage side (LV side), automatic standby input device (AVR - option), electricity meters (option) and other electrical equipment.
Dry-type transformers with capacity from 160 to 2500 kW, with protective casing, with or without forced cooling system are used for electric power conversion in KTPP. The rated voltage on the high voltage side (HV) is 6 or 10 kV.
Electrical equipment of Russian or foreign manufacturers can be used in the installation of HVHV and NKU, according to the agreement of ... .
Field of application
Used for power supply of objects in industry, power engineering, oil and gas industry, construction industry, etc.
Equipment composition
KTP includes: switchgear on the high voltage side (HV side), power transformers, low-voltage complete devices (LVD) on the low voltage side (LV side), automatic standby input device (AVR - option), electricity meters (option) and other electrical equipment.
Dry-type transformers with capacity from 160 to 2500 kW, with protective casing, with or without forced cooling system are used for electric power conversion in KTPP. The rated voltage on the high voltage side (HV) is 6 or 10 kV.
Electrical equipment of Russian or foreign manufacturers can be used in the installation of HVHV and NKU, according to the agreement of ... .
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Reclosers SP-RA
View Details
Complete switchgears of mine normal version of series 3KVE-10RN
View Details
Vacuum contactor low-voltage KVT2-1,14-5/630-1000 UHL2
View Details
Surge arrester OPN-PP-2/3,0-400-UHL1
View Details
Complete transformer substations (KTP), capacity from 6 to 2500 kVA, rated voltage 6(10)/0,4 kV.
View Details
Surge arrester OPN-TP-3,3/4-UHL1
View Details
CRUE ZEO
View Details
Surge arrester OPN-NO-1/1,2-10UKHL2.1
View Details
Control cabinet for electric heating of switches ShUES "Techno"
View Details
Nexus switchgear chambers
View Details
Surge arrester OPN-N-0,4/0,45-O2*
View Details
Surge arrester OPN-TK-3,3/4-UHL1
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions