1
Request Details
2
Contact Info

What do you need?

Describe the product or service you are looking for

Your Contact Information

We will contact you as soon as possible

Request Submitted!

Thank you! We will contact you soon with the best offers.

Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

Brand: Power Machines
$1,500,000 - $4,800,000 USD
MOQ: 1 pieces

Key Features

Rated electrical power: 190 m³
Acute vapor pressure: 12.8 thous. t storage
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540 million m³
Feed water regenerative heating temperature: 249 million m³

More from Power Machines

TVV-220-2EU3 Turbo Generator for Thermal Power Plants

TVV-220-2EU3 Turbo Generator for Thermal Power Plants

$900,000-$3,000,000
Medium Pressure Cylinder (CSD) with SD Valve Block for K-330-23.5-8MR Steam Turbine

Medium Pressure Cylinder (CSD) with SD Valve Block for K-330-23.5-8MR Steam Turbine

$90,000-$360,000
SV-588-90-40 Hydrogenerator for Small Hydropower Plants

SV-588-90-40 Hydrogenerator for Small Hydropower Plants

$90,000-$360,000
TBB-350-2U3 Turbo Generator for Kostroma GRES, Unit No. 3

TBB-350-2U3 Turbo Generator for Kostroma GRES, Unit No. 3

$1,500,000-$4,800,000

Description

The modernised turbine is an oval three-cylinder unit consisting of a DDC with loop steam movement, a CSD consisting of medium and low pressure parts and a two-stream CND. The DDC steam distribution is nozzle-type, consisting of one stop valve (SC VD) and two control valves (RC VD) combined in two valve blocks. VD SC and VD RC are of unloaded type. The flow section of the DDC consists of a regulating stage and 19 reactive pressure stages.

The working vanes of all stages of the DDC, except for the regulating stage, are made using profiles of variable cross-section. The UA rotor is one-piece forged. The flow section of the DDC consists of the 12th stage of the medium pressure part and is made with diaphragms of welded construction. The ND rotor is one-piece forged.

There is a system of moisture removal of the last stage of ND. High indicators of efficiency and reliability of steam turbines are provided by: aerodynamic experimental tests of blades confirming their reliability and efficiency; smoothly.....

Related Products

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

$900,000-$3,000,000 USD
Rated power: 66
Maximum heat load: 143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

$90,000-$360,000 USD
Fresh steam consumption: 330
Fresh steam pressure: 12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

$900,000-$3,000,000 USD
Maximum power: 220
Pressure: 12.8
UTZ OJSC 🇷🇺
Complete K-330-23.5-1R Steam Turbine for Power Unit 4

Complete K-330-23.5-1R Steam Turbine for Power Unit 4

$300,000-$1,800,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

Steam Turbine T-12/16-3.9/0.2 for Industrial Applications

$42,000-$150,000 USD
Electric power: B1/B8 2100/900 MHz
Absolute vapor pressure: 3
PJSC KALUGA TURBINE PLANT 🇷🇺
K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

$900,000-$3,000,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Energy Steam Turbine for Electric Generators 1.4MW to 80MW

Energy Steam Turbine for Electric Generators 1.4MW to 80MW

$180,000-$1,800,000 USD
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
Assignment: For drive of electric generators with the purpose of complex generation of electric and thermal energy for production and heating needs; for drive of pumps of power units of GRES and NPPs.
PJSC KALUGA TURBINE PLANT 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

$1,500,000-$4,800,000 USD
Rated power: 124.9
Nominal fresh steam flow rate: 524
UTZ OJSC 🇷🇺
Complete PT-60/70-130/7 Steam Turbine for Power Generation

Complete PT-60/70-130/7 Steam Turbine for Power Generation

$900,000-$3,600,000 USD
Nominal fresh steam flow rate: 96.7
Absolute pressure of fresh steam upstream of the stop valves of CVD: 12.75
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

$900,000-$3,000,000 USD
Nominal / maximum fresh steam flow rate: 275
Temperature of steam after superheating before stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

Steam Turbine PR-16-9.4/2.6/0.4 for Efficient Energy Generation

$30,000-$180,000 USD
Rated power: 16
Assignment: Drive of electric alternator
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

$1,500,000-$4,800,000 USD
Rated power: 150
Maximum condensing power: 160
UTZ OJSC 🇷🇺
K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

$900,000-$3,600,000 USD
Rated power of turbine: 850
Temperature of steam after superheating before DDC stop valves: 542
SILOVYE MASHINY OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

$90,000-$300,000 USD
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation

Steam Turbine R-50-12.8/1.5 for Power Generation

$90,000-$300,000 USD
Assignment: for electricity and steam generation
Assignment: for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

$1,500,000-$4,800,000 USD
Rated power: 120
Steam consumption: 540
UTZ OJSC 🇷🇺

Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation

$90,000-$600,000 USD
Power: 1340...34000
Absolute pressure of fresh steam: 1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺
Steam Turbine Diaphragm 30 Stages Model 47T230-3219

Steam Turbine Diaphragm 30 Stages Model 47T230-3219

$9,000-$30,000 USD
Overall dimensions (diameter): 2950
Overall dimensions (width): 420
UK TES LLC 🇷🇺
Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

$150-$420 USD
Jaw width: 160
Workpiece clamping force: 54000
ARMORICA LLC 🇷🇺
Graphite Electrodes EGSP-UNP Diameter 520 mm and More 650 mm

Graphite Electrodes EGSP-UNP Diameter 520 mm and More 650 mm

$900-$3,000 USD
Diameter: 710
Length: 1500
EL 6 LLC 🇷🇺
Request via WhatsApp