Available for Import
Central Processing Unit Cell for BLOCK System - Safety and Information Control
Manufacturer:
Federal State Unitary Enterprise "Production Association "OKTYABR"
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
The TSCBM-K cell is designed for:
- control of safety-related information received, generated and transmitted in the BLOCK complex;
- analysing the results of self-testing of modules, control of frequency of incoming messages, comparison of data on channels;
- analysis of incoming data from TSKBM, SAUT, RB, RBS, RBP, MPSU&D;
- analysing the "0" position of the KM driver controller knob;
- control of switching on of the electropneumatic stop valve EPC and KON block;
- control of switching on/off the EPC with the key, control of the position of the toggle switch "SERVICE BRAKING" - "OFF" / "ON";
- formation of final values of permissible and target speeds;
- comparison of actual and permissible speed values;
- formation of the service braking trajectory.
- control of safety-related information received, generated and transmitted in the BLOCK complex;
- analysing the results of self-testing of modules, control of frequency of incoming messages, comparison of data on channels;
- analysis of incoming data from TSKBM, SAUT, RB, RBS, RBP, MPSU&D;
- analysing the "0" position of the KM driver controller knob;
- control of switching on of the electropneumatic stop valve EPC and KON block;
- control of switching on/off the EPC with the key, control of the position of the toggle switch "SERVICE BRAKING" - "OFF" / "ON";
- formation of final values of permissible and target speeds;
- comparison of actual and permissible speed values;
- formation of the service braking trajectory.
Specifications
Equipment
Cell, Passport
Designation
Cell CO 36905-126-00
Power supply voltage
SBVVBG V
Power consumption
5 W
Overall dimensions
128,7x188,0x20,0 mm
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
KTSM-03 Complex for Automatic Monitoring of Railway Rolling Stock IN7.460.000.000
View DetailsCombined Tram Automation and Heating Control Cabinet SHUTA-SE-04 EIUUS.468332.011-01
View DetailsStable Power Supply for Locomotive Electronic Equipment IP-LE-50/50-400x1 100B.08.00.00-01
View DetailsAnti-Ramming Device LEGION PTAB 2000
View DetailsLED Signal Systems for Mast and Dwarf Railway Signals NCMR.676636.085TU
View DetailsLED Signal Systems for Railway Mast and Dwarf Signals (TU 3185-003-01404314-2009)
View DetailsAdditional Sections for Traffic Light - Right and Left Arrow
View DetailsLED Pedestrian Traffic Lights for Regulating Pedestrian Movement, TU 27.90.70-004-55349770-2022
View DetailsSignal Object Controller Management Module Kit for OK-EL Type 1
View DetailsSignal Object Controller Management Module Set OK-EL Type 1 (EK)
View DetailsLED Road Lighting Fixture for Highways - SKU 150 EFFECT R
View DetailsPendant Electric Signal Light with Semiconductor Lamp ESPPP2-90
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions