
2SKU.PPU-TPE - two-section bellows compensating device with heat- and hydro-insulated bellows and sleeve in polyethylene.
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Two-section bellows compensating device with heat- and hydro-insulated bellows and sleeve in a polyethylene shell with factory applied under it PPU insulation of spigots is equipped with heat- and hydro-insulated multilayer bellows made of stainless steel, factory-insulated weld-on sockets, sleeves in polyethylene sheathing for PPU insulation, gland packing for waterproofing, protective covers, guides to prevent torsional rotations and washers for additional installation of pre-stretching mechanisms. The product is provided with lifting and pre-stretching lugs. It is possible to manufacture with additional thermal insulation of bellows and SODC conductors. Compensators 2SKU.PPU-TPE are designed for compensation of axial displacements of temperature deformations of rectilinear sections of heating mains with different types of laying. They are used for underground (ductless) and aboveground laying. Guarantee 10 years. GOST R and TR CU; EAEU.
Specifications
Nominal diameter (DN)
SBVVBG mm
Pressure Pb (PN)
16
Operating medium temperature
150 °C
Type of stroke
Axial
Connection type
Welded
Additionally
The product can be equipped with a pre-stretching mechanism in quantity of 1 unit. The product can be manufactured according to customer's technical requirements: increase/decrease of compensating capacity, construction length, pressure, connection sizes.
Layers of bellows
2 (multilayer)
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Universal clamp ZU-5N(24)
View Details
CKR01-0-100-400-HDZ Smooth cross type G01 ESCA 100x400mm HDZ IEK
View Details
CPG05D-4-90-400-10 LESTA 90 deg. base 400 mm R600 IEK
View Details
CLM50D-MPV-110-12 Vertical mounting plate 110x180mm IEK
View Details
Insulated conductor holder DPI-4.85H
View Details
Vehicle registration plate Type 26
View Details
?????-????????? ???-20??-?10
View Details
Swinging gate 3D URAL 5 Zn in PP
View Details
CLP1S-41-21-21-15-25 STRUT profile perforated 41x21x1500-2,5 IEK
View Details
Street urn UK-2
View Details
Fire rescue hinged ladder LNSP-Kst-10-N
View Details
Connecting clamp ??-5.1GC
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions