سایر
کمد رختکن و لاکر
صندلی سالن همایش
کابینت پستی و یاخهای
پیشخوان و قفسه اتاق انتظار
نیمکت اتاق انتظار
کابینت روزنامه و مجله
مبل اتاق انتظار
صندلی ردیفی و تاشو
پایه و حصار راهنما
قفسه کتابخانه
جالباسی ایستاده و دیواری
ویترین و سکوی نمایشگاهی
استند اطلاعات
کیوسک رایگیری و صندوق
صندلی ورزشی، رینگ و تاتامی
تریبون و سکوی سخنرانی
بارر باله
محصولات — مبلمان فضاهای عمومی
High Stand with Two Cable Openings 8507 from "Galant Waiting Zone" Series
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
Low Stand with Two Cable Holes 8505 for Waiting Area "Galant
﷼ 1,764,000-6,300,000
MEBEL COMFORT LLC 🇷🇺
High Stand with Cutout for Cables 8516, "Waiting Zone Galant" Series
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
High Stand with Cutout for Cables 8514 "Waiting Zone Galant
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
Post your Buy Requirement
Get Quotes from Verified Suppliers
در زمان خود صرفهجویی کنید
High Stand with Cutout for Cables 8518 Zone Waiting Series
﷼ 6,300,000-17,640,000
MEBEL COMFORT LLC 🇷🇺
Corner Stand 8511 with Cable Hole - "Galant Waiting Zone" Series
﷼ 1,764,000-6,300,000
MEBEL COMFORT LLC 🇷🇺
High Stand with 2 Cable Holes, Model 8506, "Waiting Zone Galant
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
High Stand with 2 Cable Holes for Waiting Zones, Model 8504
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
FAQ
•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.