محصولات — تأمین و توزیع برق

Energy Storage System 24 kWh for Power Network Solutions

Energy Storage System 24 kWh for Power Network Solutions

﷼ 630,000,000-2,016,000,000
URALELEMENT OJSC 🇷🇺
Lithium-Ion Prismatic Battery INMCP44/147/200

Lithium-Ion Prismatic Battery INMCP44/147/200

﷼ 3,780,000-12,600,000
URALELEMENT OJSC 🇷🇺
High-Power Lithium-Ion Battery for Autonomous Power Supply ICGP11/215/205НР

High-Power Lithium-Ion Battery for Autonomous Power Supply ICGP11/215/205НР

﷼ 630,000-2,016,000
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery LPP-14.4 for Independent Power Supply

Lithium-Ion Battery LPP-14.4 for Independent Power Supply

﷼ 378,000-1,512,000
URALELEMENT OJSC 🇷🇺
باتری Elemس 150

باتری Elemس 150

﷼ 37,800-126,000
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery LPP-6.5 for Autonomous Power Supply

Lithium-Ion Battery LPP-6.5 for Autonomous Power Supply

﷼ 126,000-756,000
URALELEMENT OJSC 🇷🇺
باتری باکن VC3

باتری باکن VC3

﷼ 37,800-151,200
URALELEMENT OJSC 🇷🇺
باتری ICR50/320

باتری ICR50/320

﷼ 756,000-2,520,000
URALELEMENT OJSC 🇷🇺
باتری ICGP5/43/140

باتری ICGP5/43/140

﷼ 126,000-756,000
URALELEMENT OJSC 🇷🇺
High-Capacity Cylindrical Lithium-Ion Battery ICR19/66

High-Capacity Cylindrical Lithium-Ion Battery ICR19/66

﷼ 50,400-176,400
URALELEMENT OJSC 🇷🇺
باتری ICR50/160

باتری ICR50/160

﷼ 1,260,000-5,040,000
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery ICP17/60/65 with Protection Module

Lithium-Ion Battery ICP17/60/65 with Protection Module

﷼ 378,000-1,260,000
URALELEMENT OJSC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

در زمان خود صرفه‌جویی کنید
High-Capacity Prismatic Lithium-Ion Battery INMCP36/130/207

High-Capacity Prismatic Lithium-Ion Battery INMCP36/130/207

﷼ 3,780,000-12,600,000
URALELEMENT OJSC 🇷🇺
باتری لیتیوم-یونی LIT-1.8

باتری لیتیوم-یونی LIT-1.8

﷼ 37,800-151,200
URALELEMENT OJSC 🇷🇺
High-Capacity Lithium-Ion Battery ICGP11/215/205NE

High-Capacity Lithium-Ion Battery ICGP11/215/205NE

﷼ 378,000-1,260,000
URALELEMENT OJSC 🇷🇺
باتری ICP17/60/60

باتری ICP17/60/60

﷼ 630,000-2,016,000
URALELEMENT OJSC 🇷🇺
باتری ICGP6,7/135/150

باتری ICGP6,7/135/150

﷼ 378,000-1,512,000
URALELEMENT OJSC 🇷🇺
باتری ICP7/135/150

باتری ICP7/135/150

﷼ 378,000-1,260,000
URALELEMENT OJSC 🇷🇺
باتری لیتیوم-یونی LIT-2.5E

باتری لیتیوم-یونی LIT-2.5E

﷼ 63,000-201,600
URALELEMENT OJSC 🇷🇺

FAQ

•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.