محصولات — تأمین و توزیع برق

جعبه توزیع برق ЯУР-3/12 LIGHT IEK

جعبه توزیع برق ЯУР-3/12 LIGHT IEK

﷼ 630,000-2,016,000
IEK Holding LLC 🇷🇺
جعبه توزیع و اندازه گیری YAUR-380-300-31-L

جعبه توزیع و اندازه گیری YAUR-380-300-31-L

﷼ 378,000-1,260,000
IEK Holding LLC 🇷🇺
YAUR-380-300-31 جعبه حساب و توزیع YAUR-380-300 UHL3 IP31 IEK

YAUR-380-300-31 جعبه حساب و توزیع YAUR-380-300 UHL3 IP31 IEK

﷼ 378,000-1,260,000
IEK Holding LLC 🇷🇺
PSN02-063-5 دوشاخه قابل حمل SSI-035 63A-6چ/200/346-240/415V 3P+PE+N IP67 MAGNUM IEK

PSN02-063-5 دوشاخه قابل حمل SSI-035 63A-6چ/200/346-240/415V 3P+PE+N IP67 MAGNUM IEK

﷼ 378,000-1,260,000
IEK Holding LLC 🇷🇺
MTT12-012-0251-54 Voltage Converter 220/380V to 12V, 24V, 36V, 42V IP54 IEK

MTT12-012-0251-54 Voltage Converter 220/380V to 12V, 24V, 36V, 42V IP54 IEK

﷼ 1,512,000-5,040,000
IEK Holding LLC 🇷🇺
AC to DC Voltage Converter MTT13-036-0251-54 YTP-0.25 230/36-3 UHL2 IP54 IEK

AC to DC Voltage Converter MTT13-036-0251-54 YTP-0.25 230/36-3 UHL2 IP54 IEK

﷼ 1,134,000-3,528,000
IEK Holding LLC 🇷🇺
MTT13-012-0251-54 Transformer for 12V Power Supply

MTT13-012-0251-54 Transformer for 12V Power Supply

﷼ 630,000-2,016,000
IEK Holding LLC 🇷🇺
MTT12-036-0251-54 0.25 kW AC Voltage Converter for Lighting and Tools

MTT12-036-0251-54 0.25 kW AC Voltage Converter for Lighting and Tools

﷼ 1,260,000-4,032,000
IEK Holding LLC 🇷🇺
MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

﷼ 1,764,000-6,300,000
IEK Holding LLC 🇷🇺
AC-DC Voltage Converter 12V, 24V, 36V, 42V - MTT12-024-0251-54

AC-DC Voltage Converter 12V, 24V, 36V, 42V - MTT12-024-0251-54

﷼ 1,260,000-4,032,000
IEK Holding LLC 🇷🇺
MTT21-036-0251-54 Step-Down Transformer YTP-0.25 400/36-3 UHL2 IP54 IEK

MTT21-036-0251-54 Step-Down Transformer YTP-0.25 400/36-3 UHL2 IP54 IEK

﷼ 1,260,000-4,032,000
IEK Holding LLC 🇷🇺
پنل جانبی YKV-PB-20-60 برای VRU 2000.XXXX.600 SMART (مجموعه 2 عدد)

پنل جانبی YKV-PB-20-60 برای VRU 2000.XXXX.600 SMART (مجموعه 2 عدد)

﷼ 126,000-504,000
IEK Holding LLC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

در زمان خود صرفه‌جویی کنید
MTT13-024-0251-54 یتپ-0,25 230/24-3 اخل2 IP54 IEK

MTT13-024-0251-54 یتپ-0,25 230/24-3 اخل2 IP54 IEK

﷼ 1,764,000-6,300,000
IEK Holding LLC 🇷🇺

FAQ

•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.