1
وصف الطلب
2
معلومات الاتصال
ماذا تحتاج؟

صف المنتج أو الخدمة التي تبحث عنها

معلومات الاتصال

سنتواصل معك في أقرب وقت ممكن

تم إرسال طلبك!

شكرًا لك! سنتواصل معك قريبًا مع أفضل العروض.

مجموعة أسطوانة التوربين عالي الضغط مع صمامات التحكم

مجموعة أسطوانة التوربين عالي الضغط مع صمامات التحكم — ش.م أورال

$42,000 - $180,000 USD
MOQ: 1 units

الميزات الرئيسية

Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Average volume of modernization: in addition to replacement of high-pressure cylinder life assemblies and parts; additionally includes replacement of medium-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder.
Set: CVD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.

الوصف

The project of modernisation of the turbine T-100/120-130-2 provides for delivery of a new DDC with a single regulating stage (RS) and nine pressure stages, as well as a number of other parts and assemblies, including a modernised cam distributor with a reinforced frame, modernised regulating and stop valves, support bearing with modernised thrust pads of increased bearing capacity. Heating of the flange connection of the DDC is made through the flange skirts of the DDC horizontal connector. The VD rotor is made with a half coupling of the coupling coupling of the VD rotor and SD rotor.
Turbine modernisation provides:
- improvement of steam distribution operation;
- increase of turbine efficiency due to optimisation of the flow part.
Designation of the turbine after Modernisation: T-110/120-12,8 PR3-1.

منتجات ذات صلة

High-Pressure Turbine Cylinder Assembly with Control Valves

مجموعة أسطوانة التوربين عالي الضغط مع صمامات التحكم

$90,000-$360,000 USD
Steam flow rate upstream of the stop valve: 378.6
Nominal diameter of stop valve: 280
ش.م مصنع كالوغا توربين 🇷🇺
High-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine

أسطوانة ضغط عالي مع وحدة صمامات لتوربين البخار K-800-23.5-5MR

$90,000-$300,000 USD
Temperature of fresh steam upstream of CVD stop valves: 540
Absolute pressure of fresh steam upstream of the stop valves of CVD: 23.54
ش.م سيلوفي ماشيني 🇷🇺
High-Pressure Cylinder for K-330-23.5-6MR Steam Turbine

أسطوانة ضغط عالٍ لتوربين البخار K-330-23.5-6MR

$900,000-$3,000,000 USD
Nominal fresh steam flow rate: 265.7
Volume flow rate of cooling water passing through the condenser: 10
ش.م سيلوفي ماشيني 🇷🇺
High-Pressure Cylinder for Steam Turbine K-830-240-5M Set with Valves

اسطوانة عالية الضغط لتوربين بخاري K-830-240-5M مجموعة مع صمامات

$30,000-$180,000 USD
Service life of new turbine components: 40
Acute steam pressure upstream the stop valves of CVD and CSD, MPa: 23.54
ش.م سيلوفي ماشيني 🇷🇺
Low Pressure Mixing Heater PNSV-800-2

سخان خلط ضغط منخفض PNSV-800-2

$9,000-$36,000 USD
Height: 6160
Width: 2232
ش.م سوزمك إنيرغو 🇷🇺
T-60/66-10.2 Steam Turbine - Single-Cylinder Design

توربينة البخار T-60/66-10.2 - تصميم أسطوانة واحدة

$900,000-$3,000,000 USD
Rated power: 66
Maximum heat load: 143
ش.م أورال 🇷🇺
Steam Turbine P-50-12.8/0.8

توربين بخاري P-50-12.8/0.8

$90,000-$360,000 USD
Fresh steam consumption: 330
Fresh steam pressure: 12.8
ش.م أورال 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

التوربين البخاري T-185/220-12.8-NG - نموذج ثلاثي الأسطوانات

$900,000-$3,000,000 USD
Maximum power: 220
Pressure: 12.8
ش.م أورال 🇷🇺
High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

مجموعة ترقية الأسطوانة ذات الضغط العالي لتوربين بخار T-100

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
Steam Turbine Modernization Kit T-100

مجموعة تحديث التوربين البخاري T-100

$60,000-$600,000 USD
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

توربين البخار TP-124-12.8-NG - مولد طاقة ثلاثي الأسطوانات

$1,500,000-$4,800,000 USD
Rated power: 124.9
Nominal fresh steam flow rate: 524
ش.م أورال 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

توربين البخار PT-150/160-12.8 - نموذج أسطوانة مزدوجة

$1,500,000-$4,800,000 USD
Rated power: 150
Maximum condensing power: 160
ش.م أورال 🇷🇺
High-Pressure Cylinder Assembly for PT-135 Turbine with Valves

مجموعة اسطوانة الضغط العالي لتوربين PT-135 مع الصمامات

$30,000-$180,000 USD
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
ش.م أورال 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

توربين بخاري أحادي العمود K-85-8.0 للاستخدام الصناعي

$90,000-$300,000 USD
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
ش.م أورال 🇷🇺
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

مجموعة أسطوانة الضغط العالي لتوربين T-50 مع صمام إيقاف وصمامات تنظيم

$30,000-$180,000 USD
Electrical power maximum: 65
Maximum scope of modernization: replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
ش.م أورال 🇷🇺
High-Pressure Turbine Cylinder Assembly T-250 with Stop Valve

مجموعة أسطوانة التوربين عالي الضغط T-250 مع صمام إيقاف

$90,000-$360,000 USD
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
ش.م أورال 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

مجموعة أسطوانة التوربين عالي الضغط لترقية T-100-130

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
طلب عبر واتساب