المنتجات — قطع غيار الشاحنات

Suspension Spring Unit 99859-2410002-21 for 10000 kg Load

وحدة النوابض للتعليق 99859-2410002-21 لتحمل وزن 10000 كجم

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Suspension Leaf Spring Assembly 314000.2410002

تجميع الربيع التعليق 314000.2410002

SAR 16,875-56,250
ش.م أورال للمقطورات 🇷🇺
Suspension Spring Unit 9911.2410003-40 for 9000 kg Load

وحدة تعليق نابض 9911.2410003-40 لتحميل 9000 كجم

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Wheel Axle with Brakes for Trailers 314000.2410002 (Load Capacity up to 12t)

محور عجلة مع فرامل للمقطورات 314000.2410002 (قدرة تحميل تصل إلى 12 طن)

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Wheel axle with brakes 311060-2410003-31 (load up to 12t)

محور عجلة مع المكابح 311060-2410003-31 (حمولة تصل إلى 12 طن)

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Suspension Spring Unit 99874-2410003-20 for 10000 kg Load

وحدة تعليق نابض 99874-2410003-20 لتحميل 10000 كجم

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Suspension Spring Assembly 603100-2410003 for 18000 kg Load

مجموعة النوابض لتعليق 603100-2410003 لتحميل 18000 كجم

SAR 5,625-15,750
ش.م أورال للمقطورات 🇷🇺
Suspension Leaf Spring Assembly 603100-2410003-10

مجموعة النوابض التعليقية 603100-2410003-10

SAR 3,375-11,250
ش.م أورال للمقطورات 🇷🇺
Suspension Leaf Spring Assembly 938532-2410003-10

مجموعة النوابض التعليقية 938532-2410003-10

SAR 5,625-18,000
ش.م أورال للمقطورات 🇷🇺
Suspension Spring Unit 603000.2410003-10 with Load Capacity of 20000 kg

وحدة تعليق نابض 603000.2410003-10 بسعة تحميل 20000 كجم

SAR 5,625-18,000
ش.م أورال للمقطورات 🇷🇺
Suspension Spring Assembly 603000.2410003 for Heavy Loads

مجموعة النوابض لتعليق 603000.2410003 للأحمال الثقيلة

SAR 5,625-18,000
ش.م أورال للمقطورات 🇷🇺

الأسئلة الشائعة

Are trailer couplings and kingpins compatible with European-built trailers?
The dominant dimensions in this catalogue follow the same standards used across the European trailer industry — 50 mm couplings, 2-inch and 3.5-inch kingpins and standard fifth-wheel interfaces — so compatibility with European-pattern trailers operated in your market is generally direct. Verify the standard designation in the listing against your equipment, and ask for the dimensional drawing when in doubt.
How does buying a complete truck cab work in practice?
Cabs are listed by truck model and equipment level — bare shell, partially trimmed or fully equipped with glazing, panel and wiring. After a crash, importing an equipped cab is often cheaper and faster than panel-by-panel rebuild. Cabs ship bolted to transport frames, one or two per 40-foot container; lead time runs two to six weeks depending on configuration.
Can brake chambers and safety-critical parts be traced to the manufacturer?
Yes — heavy-duty brake chambers, couplings and similar safety items carry factory markings, batch numbers and quality passports, and shipments include conformity declarations. Buying through the marketplace connects you to the producing plant or its authorized exporter, which matters in this product class where unmarked open-market copies are a known hazard.
What is the smallest sensible order for a trailer-fleet operator rather than a dealer?
Operators commonly order a maintenance package: one season's wear parts for the fleet — brake chambers, couplings, landing-gear assemblies, suspension bushings — which typically fills a few pallets rather than a container. Suppliers accept this scale, and consolidating several factories' goods through one forwarder keeps freight reasonable. Single urgent assemblies can move by air.
Do bus parts cover both mechanical and body components?
Both. The bus segment in this category includes structural items — panels, frames, brackets — alongside mechanical components, complementing the seats and glazing found in the interior and glass categories. For a refurbishment program, a combined request listing all positions lets the marketplace match each line to the appropriate factory and consolidate shipment.
How long does delivery take to East African or Gulf ports?
Production or stock-picking typically takes one to four weeks depending on the items, then sea transit via Novorossiysk or St. Petersburg runs roughly 30–50 days to Gulf and East African ports including transshipment. Central Asian destinations are faster overland — about two to three weeks by truck. Heavy forged parts rarely justify air freight except in breakdown emergencies.