المنتجات — Turbine Cylinder Assembly
مجموعة اسطوانة الضغط العالي لتوربين PT-135 مع الصمامات
US$30,000-180,000
Minimum scope of modernization:
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Minimum scope of modernization:
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
ش.م أورال 🇷🇺
مجموعة أسطوانة الضغط العالي لتوربين T-50 مع صمام إيقاف وصمامات تنظيم
US$30,000-180,000
Electrical power maximum:
65
Maximum scope of modernization:
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
ش.م أورال 🇷🇺