المنتجات — Turbine Cylinder Assembly

High-Pressure Cylinder Assembly for PT-135 Turbine with Valves

مجموعة اسطوانة الضغط العالي لتوربين PT-135 مع الصمامات

US$30,000-180,000
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
ش.م أورال 🇷🇺
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

مجموعة أسطوانة الضغط العالي لتوربين T-50 مع صمام إيقاف وصمامات تنظيم

US$30,000-180,000
Electrical power maximum: 65
Maximum scope of modernization: replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
ش.م أورال 🇷🇺