المنتجات — الخزانات

Glycol Drainage Capacity Block ED-3/2 Black BBD(ED-3/2).00.00.000

بلوك سعة تصريف الجليكول ED-3/2 أسود BBD(ED-3/2).00.00.000

SAR 3,375-11,250
ش.ذ.م.م كورغانخيمماش 🇷🇺
Underground Drainage Tank for Methanol Storage EP 16-2000-1-2-GPI.00.000

خزان تصريف تحت الأرض لتخزين الميثانول EP 16-2000-1-2-GPI

SAR 33,750-112,500
ش.ذ.م.م كورغانخيمماش 🇷🇺
Emergency Drainage Tank SUG-494 Black V-494-PL.00.000

خزان تصريف الطوارئ SUG-494 أسود V-494-PL.00.000

SAR 33,750-112,500
ش.ذ.م.م كورغانخيمماش 🇷🇺
Accumulation Block for Reservoir Water BE-1/1.2.3

وحدة تخزين مياه الخزان BE-1/1.2.3

SAR 33,750-112,500
ش.ذ.م.م كورغانخيمماش 🇷🇺
Emergency Drainage Tank ED-3/3 Black BDE-1.0 (ED-3/2, ED-3/3) KSUPG-VM (106.11).01.00.000 TU 3600-013-00220575-2002

خزان تصريف الطوارئ ED-3/3 أسود BDE-1.0 (ED-3/2، ED-3/3) KSUPG-VM (106.11).01.00.000

SAR 11,250-45,000
ش.ذ.م.م كورغانخيمماش 🇷🇺
Underground Drainage Tank EД-4/2 Black EПП 20-2400-2-3-СО

خزان تصريف تحت الأرض ЕД-4/2 أسود ЕПП 20-2400-2-3-СО

SAR 11,250-45,000
ش.ذ.م.م كورغانخيمماش 🇷🇺
V-493 Drainage Tank EP 63-1.0-3000-1100-3-EN-T.00.000

خزان تصريف V-493 EP 63-1.0-3000-1100-3-EN-T.00.000

SAR 11,250-67,500
ش.ذ.م.م كورغانخيمماش 🇷🇺
VMR V-455 Drainage Tank 12.5-0.3-2000-1-3-EN-T.00.000

خزان تصريف VMR V-455 12.5-0.3-2000-1-3-EN-T.00.000

SAR 15,750-56,250
ش.ذ.م.م كورغانخيمماش 🇷🇺

الأسئلة الشائعة

What information does a fabricator need to quote a custom tank?
Five things: stored medium and its temperature, working volume, orientation and installation type (underground, surface, elevated), site climate, and any internal equipment such as heating coils or mixers. With that, the plant proposes material, wall thickness and a general arrangement drawing, usually within a week, and a firm price tied to current steel cost.
How are large tanks shipped if they exceed container dimensions?
Three routes are used. Vessels under roughly 3.2 metres diameter travel whole by truck or flat-rack. Larger tanks are fabricated in shell sections, shipped compactly, then welded on site — the plant supplies assembly drawings and can send a welding supervisor. Field-erected designs bolt or weld from panels for the biggest volumes.
Are septic tanks and treatment plants sized for local regulations?
Suppliers size treatment equipment from your inflow data — population equivalent or daily volume and contamination levels — and guarantee outlet parameters in the contract. You then check those outlet figures against your national discharge norms. Plants regularly adjust process stages, adding tertiary treatment or disinfection, to meet stricter local limits.
What corrosion protection is applied for underground installation?
Standard practice is abrasive blasting followed by reinforced bitumen-polymer or polyurethane external coating, with thickness measured and recorded. Internally, the lining matches the medium — from epoxy for fuels to food-grade coatings or bare stainless steel. Cathodic protection points can be welded in if your site plan uses them.
How long does fabrication take from drawing approval?
Simple single-wall tanks up to 25 cubic metres typically take 3–5 weeks from approved drawings. Stainless process vessels, double-wall fuel tanks and packaged treatment plants run 6–10 weeks depending on complexity and internal equipment. Add transport: 1–2 weeks overland to Central Asia, 4–6 weeks by sea to the Gulf or Africa.