High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

US$30,000-180,000
Electrical power maximum: 65
Maximum scope of modernization: replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
UTZ OJSC 🇷🇺