产品 — 电缆与布线

MTOC-E Terminal Coupling for Optical Cables

MTOC-E Terminal Coupling for Optical Cables

¥648-2,160
SSD OJSC 🇷🇺
MTOC-D Connector for Suspension of Self-Supporting Cables

MTOC-D Connector for Suspension of Self-Supporting Cables

¥108-345.60
SSD OJSC 🇷🇺
MTOC-A Classic Underground Fiber Optic Cable Joint

MTOC-A Classic Underground Fiber Optic Cable Joint

¥64.80-259.20
SSD OJSC 🇷🇺
Polyethylene Cable Restoration Coupling MRP

Polyethylene Cable Restoration Coupling MRP

¥6.48-25.92
SSD OJSC 🇷🇺
Polyethylene Joint Repair Sleeve MPP for Cable Joints

Polyethylene Joint Repair Sleeve MPP for Cable Joints

¥6.48-25.92
SSD OJSC 🇷🇺
Pass-Through Joint MOG-U for Urban Cables

Pass-Through Joint MOG-U for Urban Cables

¥648-2,160
SSD OJSC 🇷🇺
MGR Cable Joint for Underground Applications

MGR Cable Joint for Underground Applications

¥64.80-259.20
SSD OJSC 🇷🇺
Classic Through Cable Coupling MOH-C for Urban Cables

Classic Through Cable Coupling MOH-C for Urban Cables

¥648-2,160
SSD OJSC 🇷🇺
Hydrophobic Cable Joint Kit MGP for TP Cables

Hydrophobic Cable Joint Kit MGP for TP Cables

¥64.80-216
SSD OJSC 🇷🇺
MTG End Plug Joint for Cable Management

MTG End Plug Joint for Cable Management

¥64.80-216
SSD OJSC 🇷🇺
Universal Cable Joint MVSSK for TP Cables

Universal Cable Joint MVSSK for TP Cables

¥64.80-259.20
SSD OJSC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
Cable Joint Kit VSSK for TP Cables with Hydrophobic Filling

Cable Joint Kit VSSK for TP Cables with Hydrophobic Filling

¥21.60-129.60
SSD OJSC 🇷🇺
Cable Joint MT for KSPP Cables Protection

Cable Joint MT for KSPP Cables Protection

¥2.16-12.96
SSD OJSC 🇷🇺
Compact MTOK-M Dome-Type Splice Closure

Compact MTOK-M Dome-Type Splice Closure

¥64.80-259.20
SSD OJSC 🇷🇺

常见问题

How do Russian cable types correspond to IEC designations?
Construction principles match: VVG corresponds to copper PVC-insulated power cable of the IEC 60502-1 type, AVBbShv to armoured aluminium cable, and SIP to aerial bundled conductor. Cross-sections follow the same square-millimetre series. Suppliers issue comparison sheets and full construction drawings so your engineers can approve equivalence against project specifications.
What is the minimum order — can I buy less than a full drum?
The drum is the practical unit: cutting opens a factory length and most plants avoid it for small remnants. However, plants will wind custom lengths to order — say, 12 drums of 350 metres to match your feeder runs — which is more useful than buying standard lengths and generating offcuts. Project lots start around 5–10 km total.
Are fire-rated and halogen-free executions available?
Yes. Most power and control families come in low-smoke halogen-free (ng-LS, ng-HF) and fire-resistant (FR) executions, tested for flame spread, smoke density and circuit integrity under fire. State the fire performance class your code requires and the plant will match it and attach the corresponding test protocols.
What documentation supports a utility tender submission?
Plants provide type test protocols, routine test certificates per drum, EAC conformity declarations, construction drawings and ISO 9001 factory certification. For medium voltage cable, partial discharge and voltage test records are included. This package normally satisfies tender technical files; specific national homologation, where required, is discussed case by case.
How is cable shipped and how long does it take?
Drums load into containers or open wagons; a 40-foot container carries roughly 15–25 tonnes of cable depending on drum sizes. Production of non-stock positions takes 2–5 weeks. Trucking to Central Asia adds 7–14 days; sea freight from Novorossiysk or St. Petersburg to the Gulf or East Africa runs 25–45 days.
Can conductors be supplied in aluminium to cut project cost?
Yes, and this is a major lever: aluminium low voltage cable, with 531 listings here, prices well below copper for distribution feeders where the larger cross-section is acceptable. Suppliers will recalculate your copper schedule into aluminium equivalents, showing the cross-section conversion and the cost difference per kilometre, so you can decide line by line.