产品 — 电源与配电

High Voltage Plug 1ВШ.006

High Voltage Plug 1ВШ.006

¥216-1,296
GRAVITON LLC 🇷🇺
High Voltage Socket RU-206B for Railway Rolling Stock

High Voltage Socket RU-206B for Railway Rolling Stock

¥648-2,592
GRAVITON LLC 🇷🇺
High Voltage Socket for Electric Train Cars 1РШ.006

High Voltage Socket for Electric Train Cars 1РШ.006

¥1,080-3,888
GRAVITON LLC 🇷🇺
Low Voltage Socket 2RSh.005

Low Voltage Socket 2RSh.005

¥216-1,296
GRAVITON LLC 🇷🇺
High Voltage Connector SHU-206V

High Voltage Connector SHU-206V

¥216-1,296
GRAVITON LLC 🇷🇺
SHU-205B Plug for Rail Transport Electrical Connections

SHU-205B Plug for Rail Transport Electrical Connections

¥648-2,160
GRAVITON LLC 🇷🇺
Transformer 1TR.071 for Electric Train Equipment

Transformer 1TR.071 for Electric Train Equipment

¥1,080-3,456
GRAVITON LLC 🇷🇺
Transformer 1 TR.069 for Electric Train Equipment

Transformer 1 TR.069 for Electric Train Equipment

¥648-2,160
GRAVITON LLC 🇷🇺
Transformer 1TR.021 for Electric Train Equipment

Transformer 1TR.021 for Electric Train Equipment

¥648-2,160
GRAVITON LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.