Power Transformers
Current Transformers (Instrument)
Voltage Transformers (Instrument)
Special Purpose & Choke Transformers
Uninterruptible Power Supplies (UPS)
Voltage Stabilizers
Power Supplies & Power Modules
Inverters, Rectifiers & Battery Chargers
Frequency Converters / VFD
Measurement Transducers (Current, Voltage, Power)
Switchgear & Low-Voltage Distribution Equipment
Packaged Substations
Starter Batteries
Stationary & Lithium-Ion Batteries
Solar Power Plants & PV Modules
Power Supply & DC Backup Systems
Redundant Secondary Power Sources
Industrial Sockets & Power Columns
EV Charging Stations
Other Power Distribution Equipment
产品 — 电源与配电
Complete Pole-Mounted Transformer Substations SV-105 (SV-110) and PT-43 with Four Supports
¥10,800-129,600
Alttras OJSC 🇷🇺
Modular Outdoor Transformer Substation 16-250kVA with Circuit Breakers
¥12,960-129,600
Alttras OJSC 🇷🇺
Outdoor Pole-Mounted Transformer Substation with Automatic Circuit Breakers 10-25 kVA
¥6,480-25,920
Alttras OJSC 🇷🇺
Oil-Powered Distribution Transformer Series OMG-25-10(6)/0.23 (Pole-Mounted)
¥6,480-21,600
Alttras OJSC 🇷🇺
General Purpose Oil Distribution Transformers TMGF Series 400-630 kVA
¥21,600-129,600
Alttras OJSC 🇷🇺
发布您的采购需求
从认证供应商获取报价
节省时间
Oil-Filled Transformers for Submersible Pump Power Supply 63-630 kVA TMGP Series
¥10,800-129,600
Alttras OJSC 🇷🇺
Oil-Filled Transformer for Submersible Pumps 63-630 kVA TMGP-N Series
¥6,480-129,600
Alttras OJSC 🇷🇺
Oil Distribution Transformer for Moderate Climates 1000-1600 kVA TMH Series
¥64,800-216,000
Alttras OJSC 🇷🇺
Oil-Immersed Distribution Transformer 16-630 kVA for Outdoor Use TMГ Series
¥6,480-129,600
Alttras OJSC 🇷🇺
常见问题
•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.