产品 — 电源与配电

ZNOL-SVEL Voltage Transformers 6-35 kV

ZNOL-SVEL Voltage Transformers 6-35 kV

¥648-4,320
SVEL Group OJSC 🇷🇺
Voltage Transformers NOL(P)-SVEL for Signal Transmission

Voltage Transformers NOL(P)-SVEL for Signal Transmission

¥648-12,960
SVEL Group OJSC 🇷🇺
Current Transformers TPOL-SVEL for Voltage Levels 6-35 kV

Current Transformers TPOL-SVEL for Voltage Levels 6-35 kV

¥648-4,320
SVEL Group OJSC 🇷🇺
Current Transformers TSHL-SVEL-10 for Voltage Class 10kV

Current Transformers TSHL-SVEL-10 for Voltage Class 10kV

¥216-2,160
SVEL Group OJSC 🇷🇺
Current Transformers TSHL-SVEL-0.66 for Voltage Class 0.66 kV

Current Transformers TSHL-SVEL-0.66 for Voltage Class 0.66 kV

¥216-2,160
SVEL Group OJSC 🇷🇺
Current Transformers TSHL-SVEL-20 (24) for Voltage Levels 20-24 kV

Current Transformers TSHL-SVEL-20 (24) for Voltage Levels 20-24 kV

¥64.80-432
SVEL Group OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.