产品 — 电源与配电

DC Power Battery 23НКМ-1-Б for Specialized Devices

DC Power Battery 23НКМ-1-Б for Specialized Devices

¥216-1,296
Research Institute of Chemical Technology OJSC 🇷🇺
18NKM-0.65 Battery for Autonomous DC Power Supply

18NKM-0.65 Battery for Autonomous DC Power Supply

¥648-2,160
Research Institute of Chemical Technology OJSC 🇷🇺
Constant Current Power Supply Battery 27НКМ-10М

Constant Current Power Supply Battery 27НКМ-10М

¥648-2,592
Research Institute of Chemical Technology OJSC 🇷🇺
Battery 12НКМ-100 for Direct Current Power Supply

Battery 12НКМ-100 for Direct Current Power Supply

¥648-2,160
Research Institute of Chemical Technology OJSC 🇷🇺
2x12V Nickel-Cadmium Battery for Special Devices G73.585.807 TU/S

2x12V Nickel-Cadmium Battery for Special Devices G73.585.807 TU/S

¥216-1,296
Research Institute of Chemical Technology OJSC 🇷🇺
Battery for Autonomous DC Power Supply - Model 28НКМ-20

Battery for Autonomous DC Power Supply - Model 28НКМ-20

¥1,080-3,888
Research Institute of Chemical Technology OJSC 🇷🇺
Backup Current Source SDS-3M for Portable Radio Equipment

Backup Current Source SDS-3M for Portable Radio Equipment

¥21.60-129.60
Research Institute of Chemical Technology OJSC 🇷🇺
DC Power Supply Device for Special Equipment 15L748

DC Power Supply Device for Special Equipment 15L748

¥6,480-25,920
Research Institute of Chemical Technology OJSC 🇷🇺
Chemical Current Source SDS-4 for Radio Equipment

Chemical Current Source SDS-4 for Radio Equipment

¥21.60-129.60
Research Institute of Chemical Technology OJSC 🇷🇺
Chemical Current Source SDS-5 for Backup Power Supply

Chemical Current Source SDS-5 for Backup Power Supply

¥21.60-129.60
Research Institute of Chemical Technology OJSC 🇷🇺
DC Power Supply Set for Autonomous Power Supply Systems 15Р233-01

DC Power Supply Set for Autonomous Power Supply Systems 15Р233-01

¥6,480-21,600
Research Institute of Chemical Technology OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.