产品 — 电源与配电

PitON Uninterruptible Power Supply 10-200 kVA

PitON Uninterruptible Power Supply 10-200 kVA

¥64,800-259,200
Piton Kama LLC 🇷🇺
Microprocessor Controlled UPS PitON M-Series 0.6-1 kVA

Microprocessor Controlled UPS PitON M-Series 0.6-1 kVA

¥151.20-518.40
Piton Kama LLC 🇷🇺
PitON XT Series 60 kVA Uninterruptible Power Supply (UPS)

PitON XT Series 60 kVA Uninterruptible Power Supply (UPS)

¥64,800-216,000
Piton Kama LLC 🇷🇺
PitON HT Series 20 kVA Online UPS

PitON HT Series 20 kVA Online UPS

¥34,560-108,000
Piton Kama LLC 🇷🇺
PitON RT Series 2 kVA UPS for Reliable Power Backup

PitON RT Series 2 kVA UPS for Reliable Power Backup

¥3,024-7,920
Piton Kama LLC 🇷🇺
PitON HT Series 40 kVA Online UPS

PitON HT Series 40 kVA Online UPS

¥43,200-129,600
Piton Kama LLC 🇷🇺
PitON T-Series 10 kVA UPS - Reliable Power Backup

PitON T-Series 10 kVA UPS - Reliable Power Backup

¥6,480-21,600
Piton Kama LLC 🇷🇺
PitON HT Series 90-200 kVA Online UPS

PitON HT Series 90-200 kVA Online UPS

¥64,800-302,400
Piton Kama LLC 🇷🇺
PitON XT Series 15 kVA Online UPS

PitON XT Series 15 kVA Online UPS

¥25,920-69,120
Piton Kama LLC 🇷🇺
PitON T-Series 20 kVA UPS for Critical Power Supply

PitON T-Series 20 kVA UPS for Critical Power Supply

¥10,800-30,240
Piton Kama LLC 🇷🇺
PitON RT Series 10 kVA Uninterruptible Power Supply (UPS)

PitON RT Series 10 kVA Uninterruptible Power Supply (UPS)

¥10,800-30,240
Piton Kama LLC 🇷🇺
PitON T-Series 3 kVA UPS - Reliable Power Supply Solution

PitON T-Series 3 kVA UPS - Reliable Power Supply Solution

¥1,944-5,184
Piton Kama LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.