产品 — 电源与配电

Photovoltaic Element HVL Cell G1 SW

Photovoltaic Element HVL Cell G1 SW

¥6.48-21.60
HEVEL LLC 🇷🇺
Semi-Flexible Photovoltaic Module HVL Flex

Semi-Flexible Photovoltaic Module HVL Flex

¥1,080-12,960
HEVEL LLC 🇷🇺

High-Voltage Photovoltaic Module HVL 156 MBB M10

¥3,024-12,960
HEVEL LLC 🇷🇺
Photovoltaic Cell HVL M6 MBB for Solar Energy Conversion

Photovoltaic Cell HVL M6 MBB for Solar Energy Conversion

¥8.64-30.24
HEVEL LLC 🇷🇺
High-Efficiency Photovoltaic Module HVL 144 MBB M10

High-Efficiency Photovoltaic Module HVL 144 MBB M10

¥1,944-4,752
HEVEL LLC 🇷🇺
Photovoltaic Cell Element Q [1] - Class as per TU 1.2.2

Photovoltaic Cell Element Q [1] - Class as per TU 1.2.2

¥6.48-25.92
HEVEL LLC 🇷🇺
Photovoltaic Module HVL 72 GG 370/402 BB

Photovoltaic Module HVL 72 GG 370/402 BB

¥1,944-5,184
HEVEL LLC 🇷🇺
Photovoltaic Module HVL 72 GG [1] BB for Power Systems

Photovoltaic Module HVL 72 GG [1] BB for Power Systems

¥1,944-4,752
HEVEL LLC 🇷🇺
Photovoltaic Module HVL - Efficient Energy Solution

Photovoltaic Module HVL - Efficient Energy Solution

¥1,296-3,888
HEVEL LLC 🇷🇺
Photovoltaic Module HVL 66 GG for Renewable Energy Systems

Photovoltaic Module HVL 66 GG for Renewable Energy Systems

¥1,080-3,024
HEVEL LLC 🇷🇺
High-Voltage Photovoltaic Module HVL 144 MBB

High-Voltage Photovoltaic Module HVL 144 MBB

¥1,944-5,184
HEVEL LLC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
Photovoltaic Module HVL BIPV for Building Facades

Photovoltaic Module HVL BIPV for Building Facades

¥2,592-21,600
HEVEL LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.