产品 — 电源与配电

Low Voltage Complete Equipment SHNE Series

Low Voltage Complete Equipment SHNE Series

¥6,480-43,200
EKRA LLC 🇷🇺
Operational Direct Current System (ODCS)

Operational Direct Current System (ODCS)

¥64,800-432,000
EKRA LLC 🇷🇺
EKRA-10KC Complete Distribution Unit for Own Needs

EKRA-10KC Complete Distribution Unit for Own Needs

¥64,800-259,200
EKRA LLC 🇷🇺
NCU Distribution and Control Cabinet "NCU-BS-VD

NCU Distribution and Control Cabinet "NCU-BS-VD

¥64,800-259,200
EKRA LLC 🇷🇺
Frequency Converter Series ENN for Motor Control

Frequency Converter Series ENN for Motor Control

¥21,600-129,600
EKRA LLC 🇷🇺
Frequency Converter Series EHN for Motor Control

Frequency Converter Series EHN for Motor Control

¥302,400-2,160,000
EKRA LLC 🇷🇺
ZPU-10P Rechargeable Power Supply for DC Devices

ZPU-10P Rechargeable Power Supply for DC Devices

¥1,080-3,456
EKRA LLC 🇷🇺
Semiconductor AC Voltage Converter SST-400-500

Semiconductor AC Voltage Converter SST-400-500

¥10,800-43,200
EKRA LLC 🇷🇺
ZPU Series Thyristor Charging and Power Supply Unit

ZPU Series Thyristor Charging and Power Supply Unit

¥21,600-129,600
EKRA LLC 🇷🇺
Power Supply Module ZPU-10P-110

Power Supply Module ZPU-10P-110

¥1,080-3,456
EKRA LLC 🇷🇺
ZPU-10-4 Module Connection Cassette

ZPU-10-4 Module Connection Cassette

¥1,080-3,888
EKRA LLC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
Stabilized Power Supply Unit P190A

Stabilized Power Supply Unit P190A

¥108-432
EKRA LLC 🇷🇺
Power Converter Block BS-75KI

Power Converter Block BS-75KI

¥3,240-12,960
EKRA LLC 🇷🇺
Power Supply Module ZPU-10E-220-01

Power Supply Module ZPU-10E-220-01

¥648-2,160
EKRA LLC 🇷🇺
Power Module ZPU-10P-220 with LED Indicator

Power Module ZPU-10P-220 with LED Indicator

¥648-2,160
EKRA LLC 🇷🇺
Power Module ZPU-10E-110-01 with LED Indicator

Power Module ZPU-10E-110-01 with LED Indicator

¥648-2,160
EKRA LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.