产品 — 电源与配电

Complete Single and Double Transformer Substations KTPP

Complete Single and Double Transformer Substations KTPP

¥64,800-432,000
NEW ERA OJSC 🇷🇺
K-319 NE Complete Switchgear Units 6(10) kV

K-319 NE Complete Switchgear Units 6(10) kV

¥64,800-259,200
NEW ERA OJSC 🇷🇺
Complete Switchgear Unit K-304 NE 6(10)kV

Complete Switchgear Unit K-304 NE 6(10)kV

¥64,800-302,400
NEW ERA OJSC 🇷🇺
Complete Distribution Device 6(10)kV K-305 NE Series

Complete Distribution Device 6(10)kV K-305 NE Series

¥64,800-259,200
NEW ERA OJSC 🇷🇺
K-318 NE Complete Switchgear Devices 6(10) kV

K-318 NE Complete Switchgear Devices 6(10) kV

¥64,800-259,200
NEW ERA OJSC 🇷🇺
Complete Switchgear for 10kV K-317 NE Series

Complete Switchgear for 10kV K-317 NE Series

¥64,800-259,200
NEW ERA OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.