产品 — 电源与配电

Energy Storage System 24 kWh for Power Network Solutions

Energy Storage System 24 kWh for Power Network Solutions

¥108,000-345,600
URALELEMENT OJSC 🇷🇺
Lithium-Ion Prismatic Battery INMCP44/147/200

Lithium-Ion Prismatic Battery INMCP44/147/200

¥648-2,160
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery LPP-14.4 for Independent Power Supply

Lithium-Ion Battery LPP-14.4 for Independent Power Supply

¥64.80-259.20
URALELEMENT OJSC 🇷🇺
Elemс 150 Alkaline Battery for LED Modules

Elemс 150 Alkaline Battery for LED Modules

¥6.48-21.60
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery LPP-6.5 for Autonomous Power Supply

Lithium-Ion Battery LPP-6.5 for Autonomous Power Supply

¥21.60-129.60
URALELEMENT OJSC 🇷🇺
Single-Use Manganese-Zinc Alkaline Battery Baken VC3

Single-Use Manganese-Zinc Alkaline Battery Baken VC3

¥6.48-25.92
URALELEMENT OJSC 🇷🇺
Cylindrical Lithium-Ion Battery ICR50/320

Cylindrical Lithium-Ion Battery ICR50/320

¥129.60-432
URALELEMENT OJSC 🇷🇺
High-Power Lithium-Ion Battery ICGP5/43/140

High-Power Lithium-Ion Battery ICGP5/43/140

¥21.60-129.60
URALELEMENT OJSC 🇷🇺
High-Capacity Cylindrical Lithium-Ion Battery ICR19/66

High-Capacity Cylindrical Lithium-Ion Battery ICR19/66

¥8.64-30.24
URALELEMENT OJSC 🇷🇺
Lithium-ion Battery ICR50/160 for Electronic Devices

Lithium-ion Battery ICR50/160 for Electronic Devices

¥216-864
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery ICP17/60/65 with Protection Module

Lithium-Ion Battery ICP17/60/65 with Protection Module

¥64.80-216
URALELEMENT OJSC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
High-Capacity Prismatic Lithium-Ion Battery INMCP36/130/207

High-Capacity Prismatic Lithium-Ion Battery INMCP36/130/207

¥648-2,160
URALELEMENT OJSC 🇷🇺
Cylindrical Lithium-Ion Battery for Various Devices - LITC-1.8

Cylindrical Lithium-Ion Battery for Various Devices - LITC-1.8

¥6.48-25.92
URALELEMENT OJSC 🇷🇺
High-Capacity Lithium-Ion Battery ICGP11/215/205NE

High-Capacity Lithium-Ion Battery ICGP11/215/205NE

¥64.80-216
URALELEMENT OJSC 🇷🇺
Prismatic Lithium-Ion Battery ICP17/60/60

Prismatic Lithium-Ion Battery ICP17/60/60

¥108-345.60
URALELEMENT OJSC 🇷🇺
Lithium-Ion Battery ICGP6.7/135/150 for Standalone Power Supply

Lithium-Ion Battery ICGP6.7/135/150 for Standalone Power Supply

¥64.80-259.20
URALELEMENT OJSC 🇷🇺
High-Capacity Lithium-Ion Battery ICP7/135/150

High-Capacity Lithium-Ion Battery ICP7/135/150

¥64.80-216
URALELEMENT OJSC 🇷🇺
Cylindrical Lithium-Ion Battery LITZ-2.5E

Cylindrical Lithium-Ion Battery LITZ-2.5E

¥10.80-34.56
URALELEMENT OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.