产品 — 电源与配电

Complete Block Transformer Substations for 35 and 110 kV

Complete Block Transformer Substations for 35 and 110 kV

¥648,000-3,456,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substations from 16 to 6300 kVA

Complete Transformer Substations from 16 to 6300 kVA

¥43,200-864,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substation KTPB 110 for Outdoor Installation

Complete Transformer Substation KTPB 110 for Outdoor Installation

¥648,000-2,592,000
CHEAZ OJSC 🇷🇺

Complete Transformer Substation Type I KTPSN by ChEZAZ Russia

¥43,200-864,000
CHEAZ OJSC 🇷🇺
Complete Distribution Devices Series CHEAZ-70

Complete Distribution Devices Series CHEAZ-70

¥64,800-259,200
CHEAZ OJSC 🇷🇺
Complete Distribution Devices KRU-CHAAZ-70/35

Complete Distribution Devices KRU-CHAAZ-70/35

¥108,000-432,000
CHEAZ OJSC 🇷🇺
Input Distribution Unit with AVR up to 630A SHO 8320MK

Input Distribution Unit with AVR up to 630A SHO 8320MK

¥10,800-43,200
CHEAZ OJSC 🇷🇺
Distribution Devices for Voltage up to 10 kV

Distribution Devices for Voltage up to 10 kV

¥64,800-259,200
CHEAZ OJSC 🇷🇺
Transformer Protection Control Cabinet BEMP-DZSH SHM3Sh

Transformer Protection Control Cabinet BEMP-DZSH SHM3Sh

¥64,800-432,000
CHEAZ OJSC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
General Substation Panel EPO 1061/1-87

General Substation Panel EPO 1061/1-87

¥2,160-12,960
CHEAZ OJSC 🇷🇺

Power Supply Unit BPT 11 AO "ChEAZ" Russia

¥648-2,592
CHEAZ OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.