产品 — 工业制冷

Iceberg 25.0-B1-V011T/6-2-12-C Gas Air Cooling Unit

Iceberg 25.0-B1-V011T/6-2-12-C Gas Air Cooling Unit

¥345,600-1,080,000
BORHIMASH OJSC 🇷🇺
Gas Air Cooler Iceberg 7.5-B1-V011T-U/8-2-9.5-C

Gas Air Cooler Iceberg 7.5-B1-V011T-U/8-2-9.5-C

¥64,800-216,000
BORHIMASH OJSC 🇷🇺
Zigzag Air Cooling Units for Efficient Temperature Management

Zigzag Air Cooling Units for Efficient Temperature Management

¥108,000-432,000
BORHIMASH OJSC 🇷🇺
Air Cooling Unit Iceberg Type for Efficient Cooling Solutions

Air Cooling Unit Iceberg Type for Efficient Cooling Solutions

¥302,400-1,080,000
BORHIMASH OJSC 🇷🇺
Air Cooling Unit Block AVG-0.6-9-J-B1-22/4-2a-8 UHL1

Air Cooling Unit Block AVG-0.6-9-J-B1-22/4-2a-8 UHL1

¥64,800-216,000
BORHIMASH OJSC 🇷🇺
Air Cooling Unit Iceberg 1.6-B3-V6T-VR/8-1-12,147 (2 Sections)

Air Cooling Unit Iceberg 1.6-B3-V6T-VR/8-1-12,147 (2 Sections)

¥64,800-259,200
BORHIMASH OJSC 🇷🇺
Air Cooling Apparatus for Gas Iceberg 0.6-B1-V011T-VR/6-1-8

Air Cooling Apparatus for Gas Iceberg 0.6-B1-V011T-VR/6-1-8

¥64,800-259,200
BORHIMASH OJSC 🇷🇺
Air Gas Cooler Unit Iceberg 6.3-B1-V06T/6-1-12-C

Air Gas Cooler Unit Iceberg 6.3-B1-V06T/6-1-12-C

¥64,800-216,000
BORHIMASH OJSC 🇷🇺

常见问题

Can suppliers design a complete cold room for our facility?
Yes — this is standard practice. Send room dimensions, target temperature, the goods to be stored and your ambient climate, and the supplier proposes a panel layout with matched condensing unit and air coolers, including drawings. Equipment then ships flat-packed with assembly instructions for local contractors.
Which refrigerants are these systems built for?
Commercial equipment commonly uses R404A, R449A or R290 (propane) depending on the line; industrial systems can be built for other media by agreement. If your country restricts specific refrigerants or your technicians prefer one, state it upfront — factories configure compressors and valves accordingly.
How well does the equipment handle hot climates?
Condensing units and condensers can be selected for elevated ambient temperatures typical of the Gulf, Africa and Central Asia — the key is honest capacity selection at your real summer conditions rather than catalogue ratings. Provide your maximum ambient and the factory sizes condensers with the required reserve.
What does delivery look like for a blast freezer or cold room?
Modular panels, doors and refrigeration kits load efficiently into standard containers; a medium cold room project typically fits one 40 ft unit. Production runs 30 to 60 days for configured equipment. Sea freight serves the Gulf, Africa and Latin America; Central Asian buyers usually take direct trucks.
Is commissioning support provided?
Suppliers provide refrigerant charging data, electrical schematics and remote start-up support as standard; any competent refrigeration contractor can commission the systems. For larger plants — blast tunnels or multi-room facilities — a factory engineer can supervise installation on site for an agreed fee.