Products — Industrial Components

Gas Turbine Blade Set GTE-170.1 (Guide and Working Blades)

Gas Turbine Blade Set GTE-170.1 (Guide and Working Blades)

US$9,000-36,000
Gas temperature in front of the 1st stage guide vane: 1112.34
Total gas pressure upstream of 1st stage guide vane: 1056970
SILOVYE MASHINY OJSC 🇷🇺
Medium Pressure Cylinder (CSD) with SD Valve Block for K-330-23.5-8MR Steam Turbine

Medium Pressure Cylinder (CSD) with SD Valve Block for K-330-23.5-8MR Steam Turbine

US$90,000-360,000
Absolute vapor pressure upstream of DDC stop valves: 3.66
Temperature of steam after superheating before DDC stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Brushless Exciter BVD-1600-3000 U3 for Turbo Generators

Brushless Exciter BVD-1600-3000 U3 for Turbo Generators

US$90,000-300,000
Rated power: 1480
Nominal voltage: 515
SILOVYE MASHINY OJSC 🇷🇺
Low Pressure Cylinder Upgrade Kit for K-210-130 Steam Turbine

Low Pressure Cylinder Upgrade Kit for K-210-130 Steam Turbine

US$90,000-360,000
Rated power: 210
Nominal absolute pressure of fresh steam upstream of stop valves: 130
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine Upgrade Parts K-210-130-3M4 for Primorskaya GRES Block No. 5

Steam Turbine Upgrade Parts K-210-130-3M4 for Primorskaya GRES Block No. 5

US$90,000-360,000
Mass flow rate of fresh steam at rated mode: 173.03
Temperature of fresh steam upstream of CVD stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Medium Pressure Cylinder (CSD) with Valve Block SD for K-800-23.5-5MR Steam Turbine

Medium Pressure Cylinder (CSD) with Valve Block SD for K-800-23.5-5MR Steam Turbine

US$90,000-360,000
Absolute pressure of fresh steam upstream of DDC stop valves: 23.54
Nominal / maximum fresh steam flow rate: 694
SILOVYE MASHINY OJSC 🇷🇺
Medium Pressure Cylinder (CSD) with Valve Block for K-330-23.5-6MR Steam Turbine

Medium Pressure Cylinder (CSD) with Valve Block for K-330-23.5-6MR Steam Turbine

US$90,000-360,000
Temperature of fresh steam upstream of CVD stop valves: 540
Nominal (maximum) fresh steam flow rate: 275
SILOVYE MASHINY OJSC 🇷🇺
CSD Medium Pressure Cylinder Kit with Valve Set for K-830-240-5M Steam Turbine

CSD Medium Pressure Cylinder Kit with Valve Set for K-830-240-5M Steam Turbine

US$60,000-300,000
Maximum power at the generator terminals: 830
Steam temperature upstream of stop valves CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
High-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine

High-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine

US$90,000-300,000
Temperature of fresh steam upstream of CVD stop valves: 540
Absolute pressure of fresh steam upstream of the stop valves of CVD: 23.54
SILOVYE MASHINY OJSC 🇷🇺
High-Pressure Cylinder for K-330-23.5-6MR Steam Turbine

High-Pressure Cylinder for K-330-23.5-6MR Steam Turbine

US$900,000-3,000,000
Nominal fresh steam flow rate: 265.7
Volume flow rate of cooling water passing through the condenser: 10
SILOVYE MASHINY OJSC 🇷🇺
High-Pressure Cylinder for Steam Turbine K-830-240-5M Set with Valves

High-Pressure Cylinder for Steam Turbine K-830-240-5M Set with Valves

US$30,000-180,000
Service life of new turbine components: 40
Acute steam pressure upstream the stop valves of CVD and CSD, MPa: 23.54
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9

Steam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9

US$90,000-360,000
Maximum steam flow rate through CND: 480
Nominal temperature of fresh steam upstream of CVD stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

Save Your Time
Complete Upgrade Kit for CND K-210(215)-12.8 Turbine Block

Complete Upgrade Kit for CND K-210(215)-12.8 Turbine Block

US$90,000-360,000
Rated power: 210
Maximum steam flow rate through CND: 480
SILOVYE MASHINY OJSC 🇷🇺
Complete K-330-23.5-1R Steam Turbine for Power Unit 4

Complete K-330-23.5-1R Steam Turbine for Power Unit 4

US$300,000-1,800,000
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

K-330-23.5-1R Complete Steam Turbine for Energy Block No. 2

US$900,000-3,000,000
Nominal / maximum fresh steam flow rate: 275
Temperature of fresh steam upstream of stop valves of CVD and CSD: 540
SILOVYE MASHINY OJSC 🇷🇺
Complete PT-60/70-130/7 Steam Turbine for Power Generation

Complete PT-60/70-130/7 Steam Turbine for Power Generation

US$900,000-3,600,000
Nominal fresh steam flow rate: 96.7
Absolute pressure of fresh steam upstream of the stop valves of CVD: 12.75
SILOVYE MASHINY OJSC 🇷🇺
K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

K-330-23.5-R Steam Turbine - Three-Cylinder Condensing Model

US$900,000-3,000,000
Nominal / maximum fresh steam flow rate: 275
Temperature of steam after superheating before stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

Complete Steam Turbine T-190/225-12.8 for Power Unit No. 13 Surgut GRES-1

US$1,500,000-4,800,000
Rated electrical power: 190
Acute vapor pressure: 12.8
SILOVYE MASHINY OJSC 🇷🇺
K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

K-850-23.5-R Steam Turbine - Five-Cylinder Condensing Model

US$900,000-3,600,000
Rated power of turbine: 850
Temperature of steam after superheating before DDC stop valves: 542
SILOVYE MASHINY OJSC 🇷🇺
Gas Turbine GTE-170 for Nizhnekamsk TPP

Gas Turbine GTE-170 for Nizhnekamsk TPP

US$1,500,000-4,800,000
Rated power at generator terminals: 155.3
Gas flow rate at turbine outlet: 508.92
SILOVYE MASHINY OJSC 🇷🇺