Other Industrial Components
Machine Tools & Accessories
Structural Components
Industrial Systems & Units
Material Processing Equipment
Fasteners & Hardware
Specialized Industrial Parts
Industrial Control & Monitoring
Fluid Handling Components
Electrical & Electronic Components
Industrial Rollers & Tracks
Cooling & Temperature Control
Industrial Scales & Weighing
Products — Industrial Components
High-Pressure Turbine Cylinder Assembly with Control Valves
US$42,000-180,000
Maximum scope of modernization:
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Maximum scope of modernization:
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine
US$90,000-600,000
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Steam Turbine Modernization Kit T-100
US$60,000-600,000
Minimum scope of modernization:
modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
T-60/66-10.2 Steam Turbine - Single-Cylinder Design
US$900,000-3,000,000
Rated power:
66
Maximum heat load:
143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8
US$90,000-360,000
Fresh steam consumption:
330
Fresh steam pressure:
12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model
US$900,000-3,000,000
Maximum power:
220
Pressure:
12.8
UTZ OJSC 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator
US$1,500,000-4,800,000
Rated power:
124.9
Nominal fresh steam flow rate:
524
UTZ OJSC 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model
US$1,500,000-4,800,000
Rated power:
150
Maximum condensing power:
160
UTZ OJSC 🇷🇺
High-Pressure Turbine Cylinder Assembly T-250 with Stop Valve
US$90,000-360,000
Maximum scope of modernization:
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Maximum scope of modernization:
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
UTZ OJSC 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade
US$90,000-600,000
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
US$90,000-600,000
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use
US$90,000-300,000
Rated/maximum power:
88.4
Fresh steam pressure:
7.64
UTZ OJSC 🇷🇺
Post your Buy Requirement
Get Quotes from Verified Suppliers
Save Your Time
Steam Turbine R-50-12.8/1.5 for Power Generation
US$90,000-300,000
Assignment:
for electricity and steam generation
Assignment:
for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications
US$1,500,000-4,800,000
Rated power:
120
Steam consumption:
540
UTZ OJSC 🇷🇺