产品 — 公共空间家具

Two-Section Lounge Chair for Waiting Areas

Two-Section Lounge Chair for Waiting Areas

¥1,080-3,888
KORONA LLC 🇷🇺
Two-Section Reclining Chair

Two-Section Reclining Chair

¥1,080-3,456
KORONA LLC 🇷🇺
Theater Chair Model "Florence

Theater Chair Model "Florence

¥1,080-3,456
KORONA LLC 🇷🇺
3-Section Reclining Chair Model "FIT 3M

3-Section Reclining Chair Model "FIT 3M

¥648-2,160
KORONA LLC 🇷🇺
4-Section Chair for Comfort and Versatility

4-Section Chair for Comfort and Versatility

¥648-2,160
KORONA LLC 🇷🇺
Metal Frame Chair for Comfortable Seating

Metal Frame Chair for Comfortable Seating

¥648-2,592
KORONA LLC 🇷🇺
Theatre Chair for Auditoriums - Model TC-953

Theatre Chair for Auditoriums - Model TC-953

¥1,080-3,888
KORONA LLC 🇷🇺
Theater Seating Chair Model "FIT 0020

Theater Seating Chair Model "FIT 0020

¥648-2,160
KORONA LLC 🇷🇺
Auditorium Seating Chair for Theatres and Halls

Auditorium Seating Chair for Theatres and Halls

¥648-2,592
KORONA LLC 🇷🇺
Auditorium Concert Hall Chair Model ABC-123

Auditorium Concert Hall Chair Model ABC-123

¥1,080-3,888
KORONA LLC 🇷🇺
Theater Seat Model "FIT 0020

Theater Seat Model "FIT 0020

¥648-2,160
KORONA LLC 🇷🇺
Retro Theater Seat - Comfortable Seating Solution

Retro Theater Seat - Comfortable Seating Solution

¥648-2,160
KORONA LLC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
Conference Room Chair Model "Yukon Luxe Conference

Conference Room Chair Model "Yukon Luxe Conference

¥1,080-3,888
KORONA LLC 🇷🇺

常见问题

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.