产品 — 公共空间家具

Outdoor Trash Bin for Parks and Dog Areas

Outdoor Trash Bin for Parks and Dog Areas

¥648-2,160
LEM-STYLE LLC 🇷🇺
Outdoor Bench for Landscape Design LG1047

Outdoor Bench for Landscape Design LG1047

¥1,080-3,456
LEM-STYLE LLC 🇷🇺
Park Waste Bin for Separate Waste Collection LG1040

Park Waste Bin for Separate Waste Collection LG1040

¥3,240-10,800
LEM-STYLE LLC 🇷🇺
Outdoor Trash Bin with Galvanized Steel Frame LG1058

Outdoor Trash Bin with Galvanized Steel Frame LG1058

¥648-2,160
LEM-STYLE LLC 🇷🇺
Park Bin LG1057 - Durable Outdoor Waste Container

Park Bin LG1057 - Durable Outdoor Waste Container

¥648-2,160
LEM-STYLE LLC 🇷🇺
Park Waste Bin with Galvanized Steel Frame LG1038

Park Waste Bin with Galvanized Steel Frame LG1038

¥1,512-4,320
LEM-STYLE LLC 🇷🇺
Outdoor Trash Bin LG1059

Outdoor Trash Bin LG1059

¥648-2,160
LEM-STYLE LLC 🇷🇺
Park Trash Bin LG1036

Park Trash Bin LG1036

¥1,080-3,456
LEM-STYLE LLC 🇷🇺
Park Trash Bin LG1037

Park Trash Bin LG1037

¥648-2,160
LEM-STYLE LLC 🇷🇺

常见问题

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.