产品 — 公共空间家具

Magazine Storage Cabinet (45 pcs) 800x370x2000mm Model 405.115

Magazine Storage Cabinet (45 pcs) 800x370x2000mm Model 405.115

¥1,080-3,024
KOMOD Furniture Factory LLC 🇷🇺
Demonstration Desk B1 900x4000x500-1200x650-1250mm

Demonstration Desk B1 900x4000x500-1200x650-1250mm

¥1,512-6,048
KOMOD Furniture Factory LLC 🇷🇺
One-Sided Library Shelf 600x280x1910mm - Metal Frame

One-Sided Library Shelf 600x280x1910mm - Metal Frame

¥216-691.20
KOMOD Furniture Factory LLC 🇷🇺
Demonstration Library Shelf 900x280x1910mm

Demonstration Library Shelf 900x280x1910mm

¥518.40-1,584
KOMOD Furniture Factory LLC 🇷🇺
Library Shelf 800 - Customizable Design and Colors

Library Shelf 800 - Customizable Design and Colors

¥648-8,640
KOMOD Furniture Factory LLC 🇷🇺
Corner Library Shelf 500x500x1910mm (WxDxH)

Corner Library Shelf 500x500x1910mm (WxDxH)

¥302.40-1,080
KOMOD Furniture Factory LLC 🇷🇺

常见问题

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.