Товары — Промышленная и складская мебель

Gravity Shelving Units for Boxes - Efficient Storage Solution

Гравитационные стеллажи

₽150 000-500 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Mobile Metal Shelves for Archives, SMM 01/08

Передвижные металлические стеллажи СММ 01/08

₽150 000-300 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Universal Cantilever Racks CCK 01/07

Консольные стеллажи ССК 01/07

₽25 000-150 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Shelf Racks for Storage SSP 08/12

Полочные стеллажи ССП 08/12

₽5 000-10 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Archive Cabinet Praktik 01/08 with 3 Shelves and Security Lock

Шкаф архивный Практик 01/08

₽15 000-25 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Archive Cabinet Praktik 01/09 with 3 Shelves and High-Security Lock

Шкаф архивный Практик 01/09

₽10 000-18 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Metal Document Filing Cabinet A4 Format - Praktik D-20

Картотека Практик Д-20

₽15 000-25 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Metal Storage Cabinet with 3 Shelves and Lockable Doors - Model Praktik 01/11

Шкаф практик 01/11

₽7 000-12 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺
Medium Duty Storage Rack SGR 11/02

Стеллаж средней грузоподъёмности СГР 11/02

₽15 000-25 000
ООО "ДЕЛЮКС ГРУПП" 🇷🇺

Часто задаваемые вопросы

•How do I verify the real load capacity of shelving and racking?
Russian manufacturers state load per shelf and per section in the product passport, derived from factory testing of the profile and beam design. Ask for the passport and the assembly scheme with your quote. For pallet racking, provide your pallet weights and forklift type so the factory selects appropriate beam sections.
•How much container space does shelving actually take?
Very little, because boltless systems ship as flat bundles of posts, beams and shelf panels. As a rough figure, a 20 ft container can carry shelving for several hundred square metres of warehouse. The factory produces a packing list with exact volumes once your configuration is fixed.
•Can workbenches be configured with specific drawers and accessories?
Yes, workbench lines are modular: you select tabletop type, drawer blocks, back panels, lighting and power strips from the catalogue, and the factory assembles the combination. This is standard order practice, not custom engineering, so configured benches usually keep normal lead times of 20-30 days.
•What corrosion protection is available for humid or coastal climates?
Powder coating over phosphated steel is standard and adequate for indoor use. For washdown areas, coastal warehouses or unheated buildings in humid regions, request galvanised shelving or stainless elements, which many factories offer as a catalogue option at a price premium.
•Is there a minimum order, or can we trial one rack first?
Single-bay trial orders are possible but freight-inefficient; most buyers start with a small consolidated lot, a few benches plus several shelving bays, to evaluate steel gauge and coating quality. Volume pricing typically activates from truckload or container quantities.