Товары — Промышленная и складская мебель

Main Shelf SD for Equipment Placement

Основная полка SD

₽2 500-5 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
Heavy-Duty Workbench TB for Mechanical Workshops

Слесарный стол TB

₽45 000-75 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
Workbench with Equipment Shelf TI

Островной рабочий стол TI

₽75 000-150 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
TWN Work Table - Fixed Height Work Surface

Стол рабочий TWN

₽25 000-45 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
High-Quality Metal Workbench Cabinet with Door Pd

Тумба для верстака Pd с дверцей

₽15 000-25 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺

Разместите заявку на закупку

Получите предложения от проверенных поставщиков

Экономьте время
Ergonomic Work Desk TU

Рабочий стол TU

₽15 000-25 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
High-Quality Metal Hanging Cabinet PDH / PDHL

Подвесная тумба PDH / PDHL

₽15 000-25 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
THW Workbench with Adjustable Side Supports

Рабочий стол THW

₽45 000-80 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺
High-Quality Metal Workbench Cabinet Dr

Тумба для верстака Dr

₽15 000-25 000
ООО НПП "УНИВЕРСАЛ ПРИБОР" 🇷🇺

Часто задаваемые вопросы

•How do I verify the real load capacity of shelving and racking?
Russian manufacturers state load per shelf and per section in the product passport, derived from factory testing of the profile and beam design. Ask for the passport and the assembly scheme with your quote. For pallet racking, provide your pallet weights and forklift type so the factory selects appropriate beam sections.
•How much container space does shelving actually take?
Very little, because boltless systems ship as flat bundles of posts, beams and shelf panels. As a rough figure, a 20 ft container can carry shelving for several hundred square metres of warehouse. The factory produces a packing list with exact volumes once your configuration is fixed.
•Can workbenches be configured with specific drawers and accessories?
Yes, workbench lines are modular: you select tabletop type, drawer blocks, back panels, lighting and power strips from the catalogue, and the factory assembles the combination. This is standard order practice, not custom engineering, so configured benches usually keep normal lead times of 20-30 days.
•What corrosion protection is available for humid or coastal climates?
Powder coating over phosphated steel is standard and adequate for indoor use. For washdown areas, coastal warehouses or unheated buildings in humid regions, request galvanised shelving or stainless elements, which many factories offer as a catalogue option at a price premium.
•Is there a minimum order, or can we trial one rack first?
Single-bay trial orders are possible but freight-inefficient; most buyers start with a small consolidated lot, a few benches plus several shelving bays, to evaluate steel gauge and coating quality. Volume pricing typically activates from truckload or container quantities.