Товары — Мебель для общественных пространств

Gymnastics Bench for Schools and Universities, Art. SG-002

Скамья гимнастическая арт.СГ-002

₽15 000-30 000
АО "БЛОК" 🇷🇺
Competitive Boxing Ring Art. R-004

Ринг боксерский арт.Р-004

₽350 000-600 000
АО "БЛОК" 🇷🇺
Coffee Table - Modern Design, Stylish and Functional

Стол журнальный

₽5 000-25 000
АО "БЛОК" 🇷🇺

Разместите заявку на закупку

Получите предложения от проверенных поставщиков

Экономьте время
PVC Profile Chair for Moisture-Resistant Durability

Стул из ПВХ профиля

₽5 000-15 000
АО "БЛОК" 🇷🇺
Wall-mounted Information Stand Flower Design "Vasilok" 4.5

4.5 Стенд информационный Василек

₽2 500-4 000
АО "БЛОК" 🇷🇺
Wooden Lecterns for Space Organization

Мебель деревянная прочая: Кафедры

₽25 000-75 000
АО "БЛОК" 🇷🇺
Gymnastic and Martial Arts Tatami Mats

Маты татами

₽1 500-3 000
АО "БЛОК" 🇷🇺
Organizational Cabinet with 16 Compartments - Model ЩЯ13

Шкаф с ячейками ЩЯ13

₽25 000-45 000
АО "БЛОК" 🇷🇺
PVC Profile Bench with Hanger

Скамья - вешалка из ПВХ профиля

₽15 000-30 000
АО "БЛОК" 🇷🇺
Figure Stool with Metal Frame

Табурет "Фигурный"

₽1 000-2 500
АО "БЛОК" 🇷🇺

Часто задаваемые вопросы

•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.