A lifting unit for well repair and drilling "APR-80", manufactured on semi-trailers of own production SPTE 94163, SPTE 99100, is designed for repair, drilling and development of oil and gas wells and allows to carry out the following works:
- moving from well to well;
- installation and dismantling at the well;
- tripping operations with tubing and drill pipes and pump rods;
- trapping and other types of works, well liquidation;
- drilling out sand plugs, cement glasses;
- milling of metal objects;
- well drilling;
- well development after drilling, etc..
Tell us what you need and get quotes from verified suppliers